Quick answers
What is this project?
Proposed project of Fine Chemical & 10 MW Co-Gen Power Plant by M/s. Magnum International LLP is an approved industrial project in Bhuvad, Anjar, Kachchh, Gujarat. The site covers 23.4 acres.
Who is building it?
The applicant is MAGNUM INTERNATIONAL lLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Jul 2025), as of 27 Nov 2026.
Where is it?
In Bhuvad, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹145 crore and a site of 23.4 acres.
When was it filed?
The application was filed on 4 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Jul 2025 |
| Application filed | 4 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | MAGNUM INTERNATIONAL lLP |
| Land area | 23.4 acres (9.5 ha) |
| Project cost | ₹145 crore |
| Village / locality | Bhuvad |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07858 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jun 2025 (this page) | Environmental approval granted | 23.4 acres | ₹145 crore |
| New project filed 29 Apr 2025 | Returned to applicant | 23.4 acres | ₹145 crore |
| New project filed 18 Feb 2025 | Returned to applicant | 23.4 acres | ₹145 crore |
| Early planning filed 23 May 2024 | Cleared for impact study | 23.4 acres | ₹145 crore |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 23.4 acres, this one is smaller than 62% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhuvad, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Fine Chemical & 10 MW Co-Gen Power Plant by M/s. Magnum… — returned to applicant, 0 m away
- Proposed project of Fine Chemical & 10 MW Co-Gen Power Plant by M/s. Magnum… — returned to applicant, 0 m away
- Proposed project of Fine Chemical & 10 MW Co-Gen Power Plant by M/s. Magnum… — cleared for impact study, 0 m away
- Keshavji Manji Sorathia (QL 9723) — lapsed, 900 m away
- Shamji Manji Sorathia (QL 9800) — lapsed, 1.3 km away
- Laying Underground 66 KV Power Cable parallel to Roadside Protected forest… — forest land use approved, 1.8 km away
- Kapdi Navin Kanji — environmental approval granted, 2.8 km away
- Shri Zala Himatsinh. — under environmental review, 2.9 km away
All 4 MAGNUM INTERNATIONAL projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.