Quick answers
What is Industrial project by M/s. Jayraj Enterprise?
This lapsed industrial project by M/s. Jayraj Enterprise is in Kardej, Bhavnagar, Gujarat. The site covers 7.7 acres.
Who is building it?
The applicant is Jaykumar Dilipbhai Thakker.
Has it been approved?
No. The application was lapsed on 2 May 2025, so it is no longer under consideration.
Where is it?
In Kardej, Bhavnagar, Gujarat.
How big is it?
It has a stated cost of ₹2.6 crore and a site of 7.7 acres.
When was it filed?
The application was filed on 3 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 May 2025 |
| Application filed | 3 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Jaykumar Dilipbhai Thakker |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Kardej |
| Taluk / tehsil | Bhavnagar |
| District | Bhavnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07920 |
In context
34 applications in Bhavnagar since January 2022 are in the same category (Industry): 18 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.7 acres, this one is smaller than 56% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kardej, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 90 MM PE Pipeline to Connect Industrial - M/S Carysil Steel Ltd. Bhavnagar. — forest land use approved, 4.1 km away
- Diversion of 0.1006 Ha. of Protected Forest Land I.E. Road Side Strip… — more information requested, 4.3 km away
- Industrial project by M/s. Arvee Laboratories Pvt. Ltd. — environmental approval granted, 4.4 km away
- Industrial project by M/s. Arvee Laboratories (India) Pvt. Ltd. — returned to applicant, 4.4 km away
- 0mm Dia PE Pipeline laying Parallel from Y-Junction Vartej-Sidsar Road to… — forest land use approved, 6.7 km away
- 4'' Dia Steel With 125mm Dia. PE Gas Pipeline Connectivity from Nari Chokdi… — lapsed, 6.8 km away
- 4'' Dia Steel With 125mm Dia. PE Gas Pipeline Connectivity from Nari Chokdi… — forest land use approved, 6.9 km away
- 4'' Dia Steel With 125mm Dia. PE Gas Pipeline Connectivity from Nari Chokdi… — lapsed, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.