Project details
| Official title | Proposed expansion project for manufacturing of Pesticides Technical, Pesticide Specific Intermediates, Specialty Chemical along with addition of Captive Co-Gen Power Plant by M/s. Rallis India Limited |
|---|---|
| Status | Initial checks |
| Status since | 22 Apr 2025 |
| Application filed | 22 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Rallis India Limited |
| Land area | 17.1 acres (6.9 ha) |
| Project cost | ₹467.8 crore |
| Village / locality | Piraman |
| Taluk / tehsil | Anklesvar |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07934 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Apr 2025 (this page) | Initial checks | 17.1 acres | ₹467.8 crore |
| New project filed 23 Nov 2022 | Environmental approval granted | 17.1 acres | ₹467.8 crore |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 17.1 acres, this one is larger than 80% of them.
293 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Piraman, Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion project for manufacturing of Pesticides Technical,… — environmental approval granted, 0 m away
- Project by M/s. Rallis India Ltd — initial checks, 0 m away
- Industrial project by Coromandel International Limited — environmental approval granted, 200 m away
- Industrial project by Coromandel International Limited — cleared for impact study, 200 m away
- Ec Amendment for Change in Mode of Disposal of Effluent for M/S. Suleshvari… — returned to applicant, 250 m away
- Godwish Chemicals — initial checks, 300 m away
- EC Amendment for Change in mode of disposal of effluent for M/s. Suleshvari… — environmental approval granted, 350 m away
- Transfer of EC from IPCA Laboratories Limited to Suleshvari Pharma Private… — environmental approval granted, 350 m away
More from Rallis India Limited in Bharuch
- Agrochemical Manufacturing Plant (52000 TPA) Along with CPP (6.0 MW) — initial checks
- Project by M/s. Rallis India Ltd — initial checks
- Amalgamation of Environmental Clearances of Rallis India Limited (Unit-I) (EC… — environmental approval granted
All 5 Rallis India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.