The Line is an approved residential project in Hebatpur, Daskroi, Ahmadabad, Gujarat. It plans 70 units in 1 tower of up to 38 floors on 0.8 acres. Its stated project cost is ₹131 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Feb 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since17 Feb 2026
Application filed16 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDra Super Buildcon LLP
UseResidential
Units70
Towers1
Floors (tallest)38
Basements4
Height132 m
Parking spaces220
Land area3,100 m²
Built-up area35,143 m² (3,78,276 sq ft)
Plot area3,147 m² (33,874 sq ft)
Project cost₹131 crore
Village / localityHebatpur
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-07952

What the filings say

What is planned

DRA Super Buildcon LLP proposes to develop a residential project named "The Line" in Hebatpur, Ahmedabad. According to the applicant's project report, the development is planned as a single tall building on a plot area of 3,147 square meters. The project will consist of 70 residential units, specifically designed as 4 BHK (four-bedroom, hall, and kitchen) flats.

The building is designed with a total of 38 floors above ground, reaching a height that classifies it as a tall building under local regulations. The structure includes four basement levels and a hollow plinth for parking and services. The total built-up area is stated as 35,143.09 square meters, with a Floor Space Index (FSI) area of 16,947.08 square meters.

Key Project Figures

ItemDetail
Total Plot Area3,147 square meters
Total Built-up Area35,143.09 square meters
Total FSI Area16,947.08 square meters
Residential Units70 (4 BHK)
Total Floors38 Floors + 4 Basements
Total Parking Area7,028.09 square meters
Greenbelt Area631.84 square meters
Power Requirement (Operation)1.5 MW to 2.0 MW

Layout and design

The project layout features a single tower situated centrally on the plot. The ground floor and hollow plinth are dedicated to common amenities and parking. A swimming pool is planned at the second-floor level. Residential units begin from the third floor and continue up to the 37th floor. The 38th floor is designated for refuge area and services.

Refuge areas are integrated into the design at multiple levels, specifically on the 6th, 10th, 14th, 18th, 22nd, 26th, 30th, 34th, and 38th floors. The building will be equipped with four lifts, each with an eight-person capacity. The external facade is planned to use non-reflective glass to minimize heat island effects.

Land and surroundings

The project site is located at Final Plot No. 202 of Town Planning Scheme No. 301 (Bhadaj-Hebatpur-Shilaj). The land is currently open and undeveloped. The site is bounded by a 40-meter wide Town Planning Scheme (TPS) road to the north and an 18-meter wide TPS road to the west. The applicant states that the project is within the limits of the Ahmedabad Municipal Corporation (AMC). The nearest railway station is Chandlodiya, approximately 5.80 km away, and Ahmedabad Airport is about 9.24 km from the site.

Water, power and access

During the operational phase, the total water requirement is estimated at 86 kilolitres per day (KLD). Fresh water demand is 57 KLD, which will be sourced from the Ahmedabad Municipal Corporation (AMC). The remaining requirement will be met through recycled water. Wastewater generation is estimated at 74 KLD, which will be treated in an on-site Sewage Treatment Plant (STP). Treated water will be reused for flushing (25 KLD) and gardening (4 KLD), with the excess 45 KLD discharged into the municipal drainage network.

Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL). The project plans to install a 1,000 kVA compact substation. For energy conservation, the applicant proposes using LED lighting for 70-80% of common areas and installing solar street lights. A rooftop solar energy system with a capacity of approximately 11 kW to 94 kW is also planned.

Environmental safeguards

The applicant proposes a greenbelt covering 631.84 square meters (approximately 20% of the plot), consisting of 190 square meters of tree cover and 441.84 square meters of lawn. A total of 79 trees are planned for plantation. For rainwater management, the project will include percolation wells to recharge ground aquifers.

Solid waste management involves segregating waste at the source. Organic waste (estimated at 135 kg/day) will be processed in an on-house Organic Waste Converter (OWC) to produce manure for the greenbelt. Inorganic or dry waste (110 kg/day) will be collected by the AMC. For fire safety, the building will include a hydrant system, sprinklers in basements, fire extinguishers, and a dedicated fire tender route with a 60-tonne load-bearing capacity.

The Line site plan and layout

A drawing from the project's filings. Sign in free to see it.

The Line: Environmental Management Layout Plan: building footprint, roads, and green spaces (preview)🔒 Sign in free to see it
Environmental Management Layout Plan: building footprint, roads, and green spaces

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 97% of them.

186 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hebatpur, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.