Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Nov 2025 |
| Application filed | 1 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Marineline Buildcon LLP |
| Use | Residential |
| Units | 44 |
| Towers | 2 |
| Floors (tallest) | 11 |
| Basements | 3 |
| Parking spaces | 244 |
| Land area | 2.8 acres (1.2 ha) |
| Built-up area | 44,903 m² (4,83,331 sq ft) |
| Plot area | 11,505 m² (1,23,839 sq ft) |
| Project cost | ₹51 crore |
| Village / locality | Munjka |
| Taluk / tehsil | Rajkot |
| District | Rajkot |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08332 |
What the filings say
What is planned
Marineline Buildcon LLP proposes to develop a residential project named Abil Gulal in Munjka, Rajkot. According to the applicant's conceptual plan, the project will consist of two residential towers, Tower A and Tower B, designed with a frame structure.
The buildings are planned to reach a height of 45.00 metres. The layout includes a basement, a ground floor, and 11 upper floors. The project is designed to accommodate a total of 44 residential units, with four units per floor starting from the second floor through the 11th floor.
Project Components and Areas
| Item | Detail |
|---|---|
| Total Plot Area | 11,505.00 square metres (1.15 hectares) |
| Net Plot Area | 10,345.42 square metres |
| Total Built-up Area | 44,903.00 square metres |
| FSI Built-up Area | 31,033.09 square metres |
| Common Plot Area | 1,159.58 square metres |
| Total Residential Units | 44 |
| Maximum Building Height | 45.00 metres |
| Green Area Provided | 1,155.00 square metres |
Layout and design
The ground floor is designed to house essential services and common areas, including meter rooms, entrance foyers for both towers, and a multipurpose room measuring 8.56 x 8.97 metres with an attached kitchen and separate toilets for men and women.
Residential units are planned as large apartments. Typical floor plans for the 2nd and 5th floors show units featuring multiple bedrooms, a living room, a dining area, a kitchen with a separate wash area, a puja room, a store room, and a servant room with an attached toilet. Each tower will be served by three lifts, including one designated as a fire lift.
Parking is provided across the basement and ground levels. The ground floor includes designated visitor parking covering 365.00 square metres. Access to the basement is provided via ramps with a 1:7 slope.
Water, power and access
The project site is accessed via an 18.00-metre wide and a 15.00-metre wide Town Planning (TP) road. Internal access paths are planned to be 6.00 metres wide.
For water management, the applicant proposes a scientifically designed rain water harvesting system to recharge groundwater. A sewage treatment plant will be installed to treat wastewater, which will then be reused for landscaping, flushing, and cooling for Diesel Generator (DG) sets. Storm water management includes the provision of silt traps and oil/grease separators in parking areas.
Power will be supplemented by DG sets for emergency backup. Energy conservation measures include the use of energy-efficient lamps, maximum utilization of natural daylight through building orientation, and solar power calculations indicating a total terrace area of 2,782.36 square metres available for solar installations.
Environmental safeguards
The Environment Management Plan (EMP) outlines several mitigation measures:
- Air Quality: Dust control during construction using water sprinklers and covering incoming loads. DG sets will have adequate stack heights for pollutant dispersion.
- Noise Control: DG sets will be housed in acoustic enclosures to ensure noise levels do not exceed 75 dB(A) at a distance of one metre. A 4.00-metre high wall will enclose service areas to further reduce noise.
- Waste Management: Construction debris will be recycled where possible. During the operational phase, organic waste converters will be used for biodegradable waste, while non-recyclable waste will be collected by local authorities.
- Greenbelt: A green area of 1,155.00 square metres (approximately 10.03% of the net plot area) is planned. The applicant intends to plant native, fast-growing species with dense canopies to act as a buffer.
Marineline Buildcon Residential Project Abil Gulal site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.8 acres, this one is larger than 75% of them.
59 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Munjka, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Residential Cum Commercial Building Construction Project… — under environmental review, 500 m away
- Proposed Residential cum commercial project Orbit Royal Gardens by Skyhill… — environmental approval granted, 550 m away
- Residential Cum Commercial Project proposed by Shree Sureshbhai G Hirpara &… — environmental approval granted, 1 km away
- Proposed Residential Project Monte Carlo by Decora Reality LLP — environmental approval granted, 1.4 km away
- Proposed Residential Project by Decora Reality LLP — environmental approval granted, 1.4 km away
- Residential Cum Commercial Project proposed by Shree Bhikhabhai Popatbhai… — environmental approval granted, 1.5 km away
- Proposed commercial & hotel building construction project Hilton Double Tree… — environmental approval granted, 1.6 km away
- Residential Cum Commercial Project construction of MIG type flats and shops by… — lapsed, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.