Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Aug 2025 |
| Application filed | 23 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Patel Kanubhai M |
| Use | Mixed use |
| Units | 229 |
| Towers | 2 |
| Floors (tallest) | 10 |
| Basements | 3 |
| Height | 36 m |
| Parking spaces | 272 |
| Land area | 1.4 acres (0.6 ha) |
| Built-up area | 30,122 m² (3,24,230 sq ft) |
| Plot area | 5,828 m² (62,732 sq ft) |
| Project cost | ₹51.2 crore |
| Village / locality | Ghuma |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08377 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 25 Nov 2025 | Under environmental review | 1.4 acres | ₹51.6 crore |
| New project filed 23 Apr 2025 (this page) | Environmental approval granted | 1.4 acres | ₹51.2 crore |
What the filings say
What is planned
Shree Saffron is a residential and commercial expansion project proposed by Patel Kanubhai M. The applicant plans to construct two buildings on a plot of 0.58 hectares (1.43 acres). The development includes three basements, a ground floor or hollow plinth, and up to 10 floors, reaching a maximum height of 36.15 metres.
The project components consist of:
- Building 1: 10 floors, featuring 224 residential units.
- Building 2: 9 floors, including 9 commercial shops on the ground floor.
- Parking: A total of 8,509.56 square metres of parking space is planned, providing 272 Equivalent Car Spaces (ECS). This includes 7,692.59 square metres in the basements, 504.85 square metres in the hollow plinth, and 312.12 square metres in open areas. The basement height will be greater than 4.5 metres to accommodate mechanical parking systems.
Layout and design
The site layout includes separate entries and exits on the approach road. Internal roads and peripheral margins are designed to be 6.0 metres wide. The design incorporates five passenger lifts and five fire lifts for the taller building, while the second building will have two lifts. All staircases are designed to open at the ground level for emergency evacuation.
Energy conservation measures include the use of natural lighting, energy-efficient motors and pumps, LED lighting fixtures, and rooftop thermal insulation. The applicant has committed to generating 107.47 KW of solar power. Solar water heating will also be provided to meet 20% of the hot water demand for commercial areas.
Water, power and access
During the construction phase, the water requirement is estimated at 6.8 kilolitres per day (KLD), to be supplied via tankers. For the operation phase, the total water demand is projected at 156.07 KLD. Of this, 101.27 KLD will be fresh water sourced from the local authority, and 54.80 KLD will be recycled from treated sewage.
Sewage generation is expected to be 120.9 KLD. The applicant proposes an onsite Sewage Treatment Plant (STP) to treat this waste. Treated water will be reused for flushing and gardening through a dual plumbing system. A backup power supply will be provided by a 125 KVA diesel generator set equipped with acoustic enclosures.
Environmental safeguards
The project includes a green belt area of 976.08 square metres, which will feature 146 trees. At least 20% of the open spaces will be pervious, using grass pavers or similar materials. For rainwater management, two percolation wells are planned for groundwater recharge.
Solid waste management involves source segregation. Biodegradable waste will be processed in an onsite organic waste converter, while recyclable materials will be sold to vendors. The applicant has allocated a capital cost of ₹2.30 crore and a recurring cost of ₹11.37 lakh for the Environment Management Plan (EMP). Additionally, ₹1.024 crore is earmarked for Corporate Environmental Responsibility (CER) activities to be completed within three years of project commencement.
| Item | Detail |
|---|---|
| Total Land Area | 0.58 hectares (1.43 acres) |
| Maximum Building Height | 36.15 metres |
| Total Residential Units | 224 |
| Total Commercial Shops | 9 |
| Total Parking Space | 8,509.56 square metres (272 ECS) |
| Sewage Treatment Capacity | 120.9 KLD |
| Solar Power Generation | 107.47 KW |
| Green Belt Area | 976.08 square metres |
Shree Saffron site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 58% of them.
250 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghuma, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shree saffron — under environmental review, 0 m away
- Happy Skyside — environmental approval granted, 300 m away
- Samruddhi — environmental approval granted, 400 m away
- Maruti Park — initial checks, 550 m away
- The Park — environmental approval granted, 550 m away
- The Park — environmental approval granted, 550 m away
- The Park — environmental approval granted, 550 m away
- Good Earth — environmental approval granted, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.