Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Shree saffron

Shree saffron is an approved mixed-use project in Ghuma, Daskroi, Ahmadabad, Gujarat. It plans 229 units in 2 towers of up to 10 floors on 1.4 acres. Its stated project cost is ₹51.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Aug 2025).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since5 Aug 2025
Application filed23 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantPatel Kanubhai M
UseMixed use
Units229
Towers2
Floors (tallest)10
Basements3
Height36 m
Parking spaces272
Land area1.4 acres (0.6 ha)
Built-up area30,122 m² (3,24,230 sq ft)
Plot area5,828 m² (62,732 sq ft)
Project cost₹51.2 crore
Village / localityGhuma
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08377

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 25 Nov 2025Under environmental review1.4 acres₹51.6 crore
New project filed 23 Apr 2025 (this page)Environmental approval granted1.4 acres₹51.2 crore

What the filings say

What is planned

Shree Saffron is a residential and commercial expansion project proposed by Patel Kanubhai M. The applicant plans to construct two buildings on a plot of 0.58 hectares (1.43 acres). The development includes three basements, a ground floor or hollow plinth, and up to 10 floors, reaching a maximum height of 36.15 metres.

The project components consist of:

Layout and design

The site layout includes separate entries and exits on the approach road. Internal roads and peripheral margins are designed to be 6.0 metres wide. The design incorporates five passenger lifts and five fire lifts for the taller building, while the second building will have two lifts. All staircases are designed to open at the ground level for emergency evacuation.

Energy conservation measures include the use of natural lighting, energy-efficient motors and pumps, LED lighting fixtures, and rooftop thermal insulation. The applicant has committed to generating 107.47 KW of solar power. Solar water heating will also be provided to meet 20% of the hot water demand for commercial areas.

Water, power and access

During the construction phase, the water requirement is estimated at 6.8 kilolitres per day (KLD), to be supplied via tankers. For the operation phase, the total water demand is projected at 156.07 KLD. Of this, 101.27 KLD will be fresh water sourced from the local authority, and 54.80 KLD will be recycled from treated sewage.

Sewage generation is expected to be 120.9 KLD. The applicant proposes an onsite Sewage Treatment Plant (STP) to treat this waste. Treated water will be reused for flushing and gardening through a dual plumbing system. A backup power supply will be provided by a 125 KVA diesel generator set equipped with acoustic enclosures.

Environmental safeguards

The project includes a green belt area of 976.08 square metres, which will feature 146 trees. At least 20% of the open spaces will be pervious, using grass pavers or similar materials. For rainwater management, two percolation wells are planned for groundwater recharge.

Solid waste management involves source segregation. Biodegradable waste will be processed in an onsite organic waste converter, while recyclable materials will be sold to vendors. The applicant has allocated a capital cost of ₹2.30 crore and a recurring cost of ₹11.37 lakh for the Environment Management Plan (EMP). Additionally, ₹1.024 crore is earmarked for Corporate Environmental Responsibility (CER) activities to be completed within three years of project commencement.

ItemDetail
Total Land Area0.58 hectares (1.43 acres)
Maximum Building Height36.15 metres
Total Residential Units224
Total Commercial Shops9
Total Parking Space8,509.56 square metres (272 ECS)
Sewage Treatment Capacity120.9 KLD
Solar Power Generation107.47 KW
Green Belt Area976.08 square metres

Shree Saffron site plan and layout

A drawing from the project's filings. Sign in free to see it.

Shree Saffron: Site layout plan: building footprints, internal roads, and green spaces (preview)🔒 Sign in free to see it
Site layout plan: building footprints, internal roads, and green spaces

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 58% of them.

250 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghuma, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.