Quick answers
What is The Midas?
The Midas is an approved residential project in Bhat, Gandhinagar, Gujarat. The site covers 2.3 acres.
Who is building it?
The applicant is Sarveshvar Infracon LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Jun 2026), as of 27 Nov 2026.
Where is it?
In Bhat, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹84 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 24 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Jun 2026 |
| Application filed | 24 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Sarveshvar Infracon LLP |
| Use | Residential |
| Parking spaces | 661 |
| Land area | 2.3 acres (0.9 ha) |
| Built-up area | 64,101 m² (6,89,977 sq ft) |
| Plot area | 9,227 m² (99,319 sq ft) |
| Project cost | ₹84 crore |
| Village / locality | Bhat |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08387 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Nov 2025 (this page) | Environmental approval granted | 2.3 acres | ₹84 crore |
| New project filed 15 May 2024 | Environmental approval granted | 2.3 acres | ₹84 crore |
What the filings say
What is planned
Sarveshvar Infracon LLP (formerly M/s Anjani Infra) has received environmental approval for "The Midas," a residential and commercial building project in Gandhinagar. The applicant's project report describes a development on a plot of 0.51 hectares (1.26 acres) with a total built-up area of 34,068.91 square metres.
The project consists of four blocks with a configuration of two basements, a ground floor (or hollow plinth), and 13 upper floors. The building height is capped at 45.9 metres. The development is planned to include:
- Residential units: 110 apartments
- Commercial units: 47 shops
Layout and design
The site layout includes a central common plot of 510.31 square metres. The buildings are designed with a peripheral margin of 7.5 metres and internal roads of 7.5 metres width. Separate entry and exit points are provided on the approach road.
Parking is planned across the two basements and open ground areas, providing a total of 16,275.78 square metres (519 equivalent car spaces). The basements are designed with a height greater than 4.5 metres to accommodate potential future mechanical parking systems. The project also includes provisions for electric vehicle charging stations.
Land and surroundings
The project is located at Survey No. 451/Paiki 1, Final Plot No. 22 of Town Planning Scheme No. 3 in Kudasan, Gandhinagar. The site is within the limits of the Gandhinagar Municipal Corporation (GMC). The nearest railway station is Gandhinagar, approximately 6.80 km away, and Ahmedabad Airport is about 9.68 km from the site.
Water, power and access
During the construction phase, water requirement is estimated at 50 kilolitres per day (KLD), to be sourced via tankers. For the operational phase, the total water requirement is 176.3 KLD. Of this, 114.66 KLD of fresh water will be supplied by the GMC, while the remaining 61.64 KLD will be met through treated sewage for flushing and gardening.
Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL). The estimated demand is 50 kW during construction and 2.00 MW during operation. A 250 kVA diesel generator set is proposed for backup power. Energy conservation measures include the installation of 289.2 kW solar power generation and the use of LED lighting in common areas.
Environmental safeguards
An onsite Sewage Treatment Plant (STP) will be installed to treat an estimated 131.04 KLD of sewage. The project employs a dual plumbing system to separate fresh water from recycled water. Rainwater harvesting will be managed through three percolation wells.
Solid waste management involves segregating waste at the source. Biodegradable waste will be treated in an onsite Organic Waste Converter, while recyclable materials will be sold to vendors. Non-biodegradable waste will be collected by the GMC. The project includes a green belt of 945.53 square metres, which will feature 232 trees.
| Item | Detail |
|---|---|
| Total Built-up Area | 34,068.91 sq.m. |
| Residential Units | 110 |
| Commercial Units | 47 |
| Total Parking Area | 16,275.78 sq.m. |
| Solar Power Generation | 289.2 kW |
| Green Belt Area | 945.53 sq.m. |
| STP Capacity | 131.04 KLD (Generation) |
| Percolation Wells | 3 nos. |
The Midas site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.3 acres, this one is larger than 82% of them.
104 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhat, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Midas — environmental approval granted, 0 m away
- German Resort — environmental approval granted, 150 m away
- German Resort — environmental approval granted, 150 m away
- German 7 Star — environmental approval granted, 150 m away
- N B VENTURES, Residential & Commercial Building Project — environmental approval granted, 950 m away
- N B VENTURES, Residential & Commercial Building Project — returned to applicant, 950 m away
- N B Ventures — withdrawn, 950 m away
- Environmental Clearance for Proposed Project Sabarmati Riverfront Development… — environmental approval granted, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.