One of 2 filings for this project. The project's main page, with every filing and where each stands: Ashram proposed by Sadbhavna Seva Foundation
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jul 2025 |
| Application filed | 18 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sadbhavna Seva Foundation |
| Use | Residential |
| Units | 352 |
| Towers | 2 |
| Floors (tallest) | 12 |
| Height | 50 m |
| Parking spaces | 413 |
| Land area | 13 acres (5.3 ha) |
| Built-up area | 352 m² (3,789 sq ft) |
| Plot area | 52,611 m² (5,66,300 sq ft) |
| Project cost | ₹50 crore |
| Village / locality | Rampar Mota |
| Taluk / tehsil | Paddhari |
| District | Rajkot |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08390 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 May 2026 | Environmental approval granted | 13 acres | ₹50 crore |
| New project filed 18 Jan 2025 (this page) | Environmental approval granted | 13 acres | ₹50 crore |
What the filings say
What is planned
Sadbhavna Seva Foundation proposes to develop an ashram and old age home complex in Rampar Mota village. The project report describes a residential facility consisting of two main towers, each reaching a height of 50 metres with a ground floor or hollow plinth and 11 upper floors.
The development is divided into several functional components across the buildings:
- Residential Towers: Buildings 1 through 6 are designated for residential use, specifically as an old age home.
- Guest House: A two-unit guest house building.
- Support Facilities: A dedicated building for kitchen, dining, and a hall.
According to the applicant's area tables, the total built-up area is approximately 87,976.78 square metres. The project is designed with a frame structure and includes a total of 413 car parking spaces (CPS) in an open area of 9,500 square metres.
Layout and design
The master plan shows the residential blocks arranged around a central open courtyard measuring 22.40 by 22.40 metres. Internal pathways and planters surround the buildings. The layout includes a 3.66-metre wide passage on the residential floors. Each floor from the 4th to the 11th is designed with multiple rooms (typically 16 per floor in Building 4), each with attached toilets and shafts for services.
Vertical circulation is provided by five lifts per tower, including one designated fire lift. The staircases are 2.0 metres wide, with two staircases per tower designed to open directly to the ground level for emergency evacuation. The project includes a peripheral margin of 6 metres and internal roads of the same width to ensure unobstructed vehicle movement.
Water, power and access
During the operational phase, the total water requirement is estimated at 240.08 kilolitres per day (KLD). The applicant plans to meet 114.05 KLD of this through the local authority, while the remaining 114.05 KLD will be sourced from treated sewage. No groundwater is to be tapped during operations. A dual plumbing system will be installed to separate fresh water for domestic use from recycled water used for flushing and landscaping.
Power will be sourced from the grid, with a 125 KVA diesel generator (DG) set for backup. Energy conservation measures include the installation of a 207 KW solar power generation system, the use of LED lighting for common areas, and architectural designs that maximize natural light and ventilation. The site is accessed via an existing 30-metre wide State Highway, with separate entry and exit points.
Environmental safeguards
The applicant has proposed several mitigation measures to manage the environmental impact:
- Waste Management: An onsite Sewage Treatment Plant (STP) will treat 152.06 KLD of sewage. Biodegradable waste will be processed in an onsite Organic Waste Converter, while recyclable materials will be sold to vendors.
- Water Harvesting: The plan includes 14 percolation wells for groundwater recharge from rooftop and paved area runoff.
- Greenbelt: A total green area of 5,261.10 square metres is planned, which includes a tree-covered area of 3,600 square metres with 1,320 indigenous trees.
- Air and Noise: The DG set will be housed in an acoustic enclosure with an exhaust stack 3 metres above the rooftop. During construction, dust will be controlled using water sprinklers and barricades.
Timeline
The project's environmental approval was granted on 14 July 2025. The Corporate Environment Responsibility (CER) activities, which include firefighting systems and tree plantation across Rajkot, Jamnagar, and Porbandar districts, are scheduled to be completed within three years from the commencement of the project.
Sadbhavna Seva Foundation Ashram Proposed site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 13 acres, this one is larger than 97% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rampar Mota, Paddhari, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ashram proposed by Sadbhavna Seva Foundation — environmental approval granted, 0 m away
- Diversion of 0.14 Ha. Forest Land for Padadhri to Sadbhavana Vrudhashram… — more information requested, 1.8 km away
- Industrial project by M/s. Bhakti Pharmaceutical Private Limited — cleared for impact study, 2.3 km away
- Industrial project by M/s. Ramdut Alloys Private Limited — lapsed, 3.8 km away
- Paddhari Goup Gr.W.S.S (WSS-6 General) Augmentation program — forest land use approved, 4.7 km away
- Laying of 66 KV line LILO at 66KV Paddhari SS from Exist. 66KV Hadala -… — forest land use approved, 4.9 km away
- Road Access in Forest Land — forest land use approved, 5.6 km away
- Industrial project by M/s. Anlon Healthcare Pvt. Ltd. (Unit-2) — withdrawn, 5.9 km away