Environmental approval grantedBuildings & townships · Rajkot, Gujarat

Ashram proposed by Sadbhavna Seva Foundation

Ashram proposed by Sadbhavna Seva Foundation is an approved residential project in Rampar Mota, Paddhari, Rajkot, Gujarat. It plans 352 units in 2 towers of up to 12 floors on 13 acres. Its stated project cost is ₹50 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 14 Jul 2025).

See it on the live map All projects in Rajkot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Ashram proposed by Sadbhavna Seva Foundation

Project details

StatusEnvironmental approval granted
Status since14 Jul 2025
Application filed18 Jan 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSadbhavna Seva Foundation
UseResidential
Units352
Towers2
Floors (tallest)12
Height50 m
Parking spaces413
Land area13 acres (5.3 ha)
Built-up area352 m² (3,789 sq ft)
Plot area52,611 m² (5,66,300 sq ft)
Project cost₹50 crore
Village / localityRampar Mota
Taluk / tehsilPaddhari
DistrictRajkot
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08390

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 26 May 2026Environmental approval granted13 acres₹50 crore
New project filed 18 Jan 2025 (this page)Environmental approval granted13 acres₹50 crore

What the filings say

What is planned

Sadbhavna Seva Foundation proposes to develop an ashram and old age home complex in Rampar Mota village. The project report describes a residential facility consisting of two main towers, each reaching a height of 50 metres with a ground floor or hollow plinth and 11 upper floors.

The development is divided into several functional components across the buildings:

According to the applicant's area tables, the total built-up area is approximately 87,976.78 square metres. The project is designed with a frame structure and includes a total of 413 car parking spaces (CPS) in an open area of 9,500 square metres.

Layout and design

The master plan shows the residential blocks arranged around a central open courtyard measuring 22.40 by 22.40 metres. Internal pathways and planters surround the buildings. The layout includes a 3.66-metre wide passage on the residential floors. Each floor from the 4th to the 11th is designed with multiple rooms (typically 16 per floor in Building 4), each with attached toilets and shafts for services.

Vertical circulation is provided by five lifts per tower, including one designated fire lift. The staircases are 2.0 metres wide, with two staircases per tower designed to open directly to the ground level for emergency evacuation. The project includes a peripheral margin of 6 metres and internal roads of the same width to ensure unobstructed vehicle movement.

Water, power and access

During the operational phase, the total water requirement is estimated at 240.08 kilolitres per day (KLD). The applicant plans to meet 114.05 KLD of this through the local authority, while the remaining 114.05 KLD will be sourced from treated sewage. No groundwater is to be tapped during operations. A dual plumbing system will be installed to separate fresh water for domestic use from recycled water used for flushing and landscaping.

Power will be sourced from the grid, with a 125 KVA diesel generator (DG) set for backup. Energy conservation measures include the installation of a 207 KW solar power generation system, the use of LED lighting for common areas, and architectural designs that maximize natural light and ventilation. The site is accessed via an existing 30-metre wide State Highway, with separate entry and exit points.

Environmental safeguards

The applicant has proposed several mitigation measures to manage the environmental impact:

Timeline

The project's environmental approval was granted on 14 July 2025. The Corporate Environment Responsibility (CER) activities, which include firefighting systems and tree plantation across Rajkot, Jamnagar, and Porbandar districts, are scheduled to be completed within three years from the commencement of the project.

Sadbhavna Seva Foundation Ashram Proposed site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Sadbhavna Seva Foundation Ashram Proposed: Master layout plan: residential towers, parking areas, and highway access (preview)🔒 Sign in free to see it
Master layout plan: residential towers, parking areas, and highway access
Sadbhavna Seva Foundation Ashram Proposed: Typical floor plan (4th to 11th floor) showing room layouts and central courtyard (preview)🔒 Sign in free to see it
Typical floor plan (4th to 11th floor) showing room layouts and central courtyard
Sadbhavna Seva Foundation Ashram Proposed: Building section AA: 11 floors plus ground and terrace levels (preview)🔒 Sign in free to see it
Building section AA: 11 floors plus ground and terrace levels
Sadbhavna Seva Foundation Ashram Proposed: Detailed site layout with kitchen, dining, and guest house building areas (preview)🔒 Sign in free to see it
Detailed site layout with kitchen, dining, and guest house building areas

In context

134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 13 acres, this one is larger than 97% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rampar Mota, Paddhari, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.