Quick answers
What is "Education Campus of Shrimad Rajchandra Educational Trust"?
"Education Campus of Shrimad Rajchandra Educational Trust" is an approved education project in Karanjveri, Dharampur, Valsad, Gujarat. It plans 13 towers of up to 5 floors on 24.5 acres.
Who is building it?
The applicant is Shrimad Rajchandra Educational Trust.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Feb 2026), as of 27 Nov 2026.
Where is it?
In Karanjveri, Dharampur, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹236.8 crore and a site of 24.5 acres.
When was it filed?
The application was filed on 18 Nov 2025.
Project details
| Official title | Proposed construction of "Education Campus of Shrimad Rajchandra Educational Trust" |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Feb 2026 |
| Application filed | 18 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shrimad Rajchandra Educational Trust |
| Use | Education |
| Towers | 13 |
| Floors (tallest) | 5 |
| Basements | 1 |
| Height | 17 m |
| Parking spaces | 788 |
| Land area | 24.5 acres (9.9 ha) |
| Built-up area | 49,748 m² (5,35,482 sq ft) |
| Plot area | 99,143 m² (10,67,165 sq ft) |
| Project cost | ₹236.8 crore |
| Village / locality | Karanjveri |
| Taluk / tehsil | Dharampur |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08448 |
In context
64 applications in Valsad since January 2022 are in the same category (Buildings & townships): 46 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.5 acres, this one is larger than 89% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karanjveri, Dharampur, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 125mm dia. PE pipeline – For connecting CNG station at Dwarkesh Petroleum,… — forest land use approved, 2.1 km away
- Diversion of 0.3400 Ha Protected Forest Land in Favour of Dharampur… — more information requested, 3.6 km away
- Diversion of 7.0202 ha. Protected Forest Land for Widening and Strengthening… — more information requested, 4.1 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — more information requested, 4.2 km away
- Underground Drainage Line Phase-II (SJMMSVY) Project — more information requested, 5.1 km away
- Sand Quarry Mining — lapsed, 5.3 km away
- Utilization of Reserved Forest Land for Establishment of Snake Research… — lapsed, 5.6 km away
- Utilization of 0.89 Ha Reserved Forest Land for Establishment of Snake… — lapsed, 5.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.