One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 200 KLPD Grain Based Distillery (for fuel ethanol) by Energen Biotech LLP
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Jun 2025 |
| Application filed | 21 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Energen Biotech LLP |
| Land area | 22.7 acres (9.2 ha) |
| Project cost | ₹198 crore |
| Village / locality | Kalyangadh |
| Taluk / tehsil | Bavla |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08486 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 21 Mar 2025 (this page) | Lapsed | 22.7 acres | ₹198 crore |
| New project filed 5 Aug 2024 | Returned to applicant | 22.7 acres | ₹198 crore |
In context
218 applications in Ahmadabad since January 2022 are in the same category (Industry): 125 approved, 68 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.7 acres, this one is larger than 97% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalyangadh, Bavla, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 200 KLPD Grain Based Distillery (for fuel ethanol) by Energen Biotech… — returned to applicant, 0 m away
- work of laying of 66 KV S/C (3+1) Kerala - Kalyangadh Under Ground Cable line… — more information requested, 1.4 km away
- Proposed Change in Product Mix for the Manufacturing of Synthetic Organic… — initial checks, 2.1 km away
- Environment Clearance for Existing Secondary Metallurgical Industry by M/s.… — more information requested, 2.3 km away
- Laying of 66 KV S/C (3+1) Kalyangadh - Bhayla Under Ground Cable line by 1C x… — initial checks, 2.8 km away
- Industrial project by Amendment in Environment Clearance (EC) of VMS TMT… — lapsed, 3.6 km away
- Proposed Synthetic Organic Chemicals (Active pharmaceutical ingredient (API)/… — under environmental review, 3.9 km away
- Arvind Lake City — environmental approval granted, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.