Environmental approval grantedBuildings & townships · Rajkot, Gujarat

Proposed Residential cum Commercial Project Harishyam by Harishyam Creators LLP

Proposed Residential cum Commercial Project Harishyam by Harishyam Creators LLP is an approved mixed-use project in Mavdi, Rajkot, Gujarat. The site covers 5.5 acres. Its stated project cost is ₹130 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Feb 2026).

See it on the live map All projects in Rajkot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since11 Feb 2026
Application filed1 Dec 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorBuildings & townships
ApplicantKishorsinh R Jadeja
UseMixed use
Land area5.5 acres (2.2 ha)
Project cost₹130 crore
Village / localityMavdi
Taluk / tehsilRajkot
DistrictRajkot
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08513

What the filings say

What is planned

Harishyam Creators LLP proposes a residential and commercial project in Mavdi, Rajkot. The development consists of 12 buildings, each comprising a basement, a ground floor or hollow plinth, and 14 upper floors. The maximum height of the buildings is set at 52.0 metres.

The project includes four distinct tower types with varying floor areas and lift configurations:

Each tower will include one dedicated fire lift. All staircases are designed to open at the ground level for emergency evacuation.

Layout and design

The project site covers a total land area of 2.23 hectares (5.51 acres). The peripheral margin around the buildings will be 6 metres wide, and internal roads will also be 6 metres wide. Separate entry and exit points are planned for the project from the approach road.

Parking facilities will cover a total area of 27,488.16 square metres, providing space for 904 equivalent car spaces (ECS). This is distributed across the basement (19,548.65 square metres), hollow plinth (6,669.51 square metres), and open areas (1,270.00 square metres). The basement height will exceed 4.5 metres to accommodate potential future mechanical parking systems.

Water, power and access

During the construction phase, the fresh water requirement is estimated at 22.50 kilolitres per day (KLD), to be supplied by tankers. For the operation phase, the total water requirement is 449.0 KLD. Of this, 254.0 KLD will be fresh water sourced from the Rajkot Municipal Corporation (RMC), while 195.0 KLD will be met through treated sewage.

Sewage generation is expected to be 339.20 KLD, which will be treated in an onsite Sewage Treatment Plant (STP). A dual plumbing system will be installed to use treated water for flushing and gardening. Rainwater harvesting will be managed through seven percolation wells.

Power backup will be provided by a 125 KVA diesel generator set. Energy conservation measures include the installation of 440 KW solar power generation, solar street lights, and the use of LED fixtures.

Environmental safeguards

The project proponent has allocated a green belt area of 2,300 square metres, which includes a tree-covered area of 610 square metres with approximately 560 trees.

Solid waste management plans include an onsite Organic Waste Converter to treat biodegradable waste. Recyclable waste will be sold to vendors, and other garbage will be disposed of through the RMC system. To mitigate noise and air pollution, the basement will be equipped with a carbon monoxide (CO) sensor-based exhaust system.

Timeline

The project was originally granted environmental clearance in July 2025 under the name of Kishorsinh R Jadeja & Others. An application was subsequently filed in December 2025 to transfer the clearance to Harishyam Creators LLP following a change in ownership.

In context

134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5.5 acres, this one is larger than 90% of them.

84 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mavdi, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.