What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kachchh, Gujarat

PROPOSED EXPANSION IN MANUFACTURING OF SPECIALITY CHEMICALS AND ADDITION OF PILOT PLANT AT PART NO. 02, BLOCK - F, SECTOR – 12 N, ADANI PORTS & SEZ, TALUKA – MUNDRA, DIST – KUTCH 370421, GUJARAT by DORF-KETAL CHEMICALS INDIA LIMITED

PROPOSED EXPANSION IN MANUFACTURING OF SPECIALITY CHEMICALS AND ADDITION OF PILOT PLANT AT PART NO. 02, BLOCK - F, SECTOR – 12 N, ADANI PORTS & SEZ, TALUKA – MUNDRA, DIST – KUTCH 370421, GUJARAT by DORF-KETAL CHEMICALS INDIA LIMITED is a proposed industrial project in Mundra, Kachchh, Gujarat. The site covers 18.1 acres. Its stated project cost is ₹372.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 12 Dec 2025).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

PROPOSED EXPANSION IN MANUFACTURING OF SPECIALITY CHEMICALS AND ADDITION OF PILOT PLANT AT PART NO. 02, BLOCK - F, SECTOR – 12 N, ADANI PORTS & SEZ, TALUKA – MUNDRA, DIST – KUTCH 370421, GUJARAT by DORF-KETAL CHEMICALS INDIA LIMITED is a proposed industrial project in Mundra, Kachchh, Gujarat. The site covers 18.1 acres.

Who is building it?

The applicant is Dorf-Ketal Chemicals India Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 12 Dec 2025), as of 27 Nov 2026.

Where is it?

In Mundra, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹372.7 crore and a site of 18.1 acres.

When was it filed?

The application was filed on 29 Nov 2025.

Project details

StatusCleared for impact study
Status since12 Dec 2025
Application filed29 Nov 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantDorf-Ketal Chemicals India Limited
Land area18.1 acres (7.3 ha)
Project cost₹372.7 crore
Village / localityMundra
Taluk / tehsilMundra
DistrictKachchh
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-08515

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 18.1 acres, this one is smaller than 66% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (10.3 km away).

Other projects nearby

More from Dorf-Ketal Chemicals India Limited in Kachchh

All 7 Dorf-Ketal Chemicals India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.