Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Jul 2025 |
| Application filed | 19 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bala Premjibhai Khimajibhai |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹2.8 crore |
| Village / locality | Bhimpura (Kukad) |
| Taluk / tehsil | Dabhoi |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08551 |
In context
297 applications in Vadodara since January 2022 are in the same category (Mining): 133 approved, 57 filed or under review, and 107 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.9 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Bhimpura (Kukad), Dabhoi, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Nikhilbhai Dungarshibhai Pipaliya Bhimpura (Kukad) Ordinary Sand & Gravel… — cleared for impact study, 600 m away
- Shri Jayeshbhai Manubhai Patel, Area - 2.80.21 Ha., Re-appraisal of… — not approved, 800 m away
- Shri Rameshbhai Bachubhai Munjani — cleared for impact study, 1.4 km away
- Shri Rameshbhai Bachubhai Munjani Bhimapura Ordinary Sand&gravel Block No. 4 — cleared for impact study, 1.7 km away
- Shri Bharat Govindbhai Bharwad Karnet Block-2 — lapsed, 1.8 km away
- Shri Dharmikkumar R Patel-Block-3 — initial checks, 2.1 km away
- Ikbalkhan Nivajkhan Kureshi — lapsed, 5.4 km away
- Ikbalkha Nivajkha Kureshi — environmental approval granted, 5.4 km away
More from Bala Premjibhai Khimajibhai in Vadodara
- Mining project by M/s. Aditya Infrastructure Asodra Block-7 — environmental approval granted
- Mining project by M/s. Aditya Infrastructure Asodra Block-6 — environmental approval granted
- Mining project by M/s. Aditya Infrastructure Asodra Block-6 — cleared for impact study
- Mining project by M/s. Aditya Infrastructure Asodra Block-7 — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.