What is Integrated Treatment, Storage and Disposal Facility?
Integrated Treatment, Storage and Disposal Facility is a lapsed waste management project in Kocharva, Vapi, Valsad, Gujarat. The site covers 35.8 acres.
Who is building it?
The applicant is Vapi Green Enviro Limited.
Has it been approved?
No. The application was lapsed on 14 Aug 2025, so it is no longer under consideration.
Where is it?
In Kocharva, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹206.8 crore and a site of 35.8 acres.
When was it filed?
The application was filed on 8 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Aug 2025 |
| Application filed | 8 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Waste management |
| Applicant | Vapi Green Enviro Limited |
| Land area | 35.8 acres (14.5 ha) |
| Project cost | ₹206.8 crore |
| Village / locality | Kocharva |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08552 |
In context
5 applications in Valsad since January 2022 are in the same category (Waste management): 2 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
198 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kocharva, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion in existing plant capacity of Synthetic Organic Chemicals… — cleared for impact study, 550 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S… — environmental approval granted, 750 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S… — returned to applicant, 750 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S… — cleared for impact study, 750 m away
- Proposed Expansion Project for the Manufacturing of Dyes Intermediates by M/S… — environmental approval granted, 750 m away
- The Proposed Proposal Is for Expansion in Existing Plant Capacity of Synthetic… — cleared for impact study, 800 m away
- Submission of 0.3521 Forest Land (Protected) Proposal for Diversion for Social… — under forest review, 850 m away
- Industrial project by M/s. Swati Spentose Pvt. Ltd. (Unit-I) — lapsed, 900 m away
More from Vapi Green Enviro Limited in Valsad
- Laying of Onshore & Offshore Treated Wastewater Disposal Pipeline for 70 MLD… — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.