Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Aug 2025 |
| Application filed | 28 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Muniswami Buildcon |
| Use | Mixed use |
| Units | 196 |
| Towers | 4 |
| Floors (tallest) | 10 |
| Basements | 1 |
| Parking spaces | 252 |
| Land area | 1.2 acres (0.5 ha) |
| Built-up area | 23,427 m² (2,52,166 sq ft) |
| Plot area | 4,915 m² (52,905 sq ft) |
| Project cost | ₹57.4 crore |
| Village / locality | Vastral |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 Nov 2026 | Under environmental review | 1.2 acres | ₹57.7 crore |
| New project filed 28 Jun 2025 (this page) | Environmental approval granted | 1.2 acres | ₹57.4 crore |
What the filings say
What is planned
Muniswami Buildcon proposes an expansion of its residential and commercial project, Shreeji Sankalp, in Vastral. The project is planned on a plot area of 4,915 square metres (1.21 acres) with a total built-up area of 23,427.42 square metres.
The development consists of four blocks with the following configurations:
- Blocks A and B: One basement, a ground floor or hollow plinth, and 9 upper floors.
- Blocks C and D: One basement, a ground floor or hollow plinth, and 10 upper floors.
The project will provide a total of 168 residential units and 28 commercial units. The tallest buildings will reach a height of 10 floors above the ground level.
Layout and design
The layout plan indicates a 15.00-metre wide Town Planning Scheme (TPS) road adjacent to the site. The design incorporates a hollow plinth area of 1,804.72 square metres and a basement area of 3,015.72 square metres.
Parking is planned for 252 cars (Equivalent Car Space), which includes mechanical parking in the basement. The applicant has committed to providing electric charging points for 20% of the parking spaces. Internal access is managed through separate entry and exit gates to ensure smooth vehicular movement.
Water, power and access
During the construction phase, the water requirement is estimated at 12.3 kilolitres per day (KLD), to be sourced via tankers. For the operation phase, the total water demand is projected at 132 KLD. Of this, 84.59 KLD will be fresh water sourced from borewells, while 47.41 KLD will be met through treated sewage for flushing and gardening.
Sewage generation is expected to be 104.11 KLD, which will be treated in an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD. A dual plumbing system will be installed to separate treated water for flushing.
Power will be supplied by the local grid, with a 125 KVA Diesel Generator (DG) set proposed for emergency backup. The project also includes the installation of a 99 KW solar power generation system.
Environmental safeguards
The applicant plans to develop a greenbelt covering 620.20 square metres, which is approximately 10% of the plot area. This area will include 123 trees. For stormwater management, two percolation wells are proposed for groundwater recharge.
Solid waste management involves source segregation into dry and wet waste. Biodegradable waste will be treated in an onsite Organic Waste Convertor (OWC), while recyclable materials will be sold to vendors.
Under Corporate Environmental Responsibility (CER), the applicant has allocated ₹114.86 lakh for various local initiatives, including:
- Rainwater harvesting structures in Memadpur and Gatrad villages.
- Drinking water facilities and solar panel installations at primary schools in Bibipura and Memadpur.
- Distribution of waste bins and an OWC for local villages.
- Tree plantation along the Gatrad Gaam road.
| Item | Detail |
|---|---|
| Total Plot Area | 4,915 sq. m. |
| Total Built-up Area | 23,427.42 sq. m. |
| Residential Units | 168 |
| Commercial Units | 28 |
| STP Capacity | 150 KLD |
| Total Parking | 252 ECS |
| Greenbelt Area | 620.20 sq. m. |
| Solar Power | 99 KW |
Shreeji Sankalp site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.
152 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vastral, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shreeji Sankalp — under environmental review, 0 m away
- Shreedhar Royal — environmental approval granted, 100 m away
- Hilltown Heaven — environmental approval granted, 100 m away
- Hilltown Heaven — environmental approval granted, 100 m away
- Hilltown Heaven — environmental approval granted, 100 m away
- Sahajanand Palace — under environmental review, 200 m away
- Antillia Sky — under environmental review, 200 m away
- Jivan Kala Residency — environmental approval granted, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.