Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Jul 2025 |
| Application filed | 18 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Onyx Developers |
| Use | Residential |
| Units | 36 |
| Towers | 2 |
| Floors (tallest) | 19 |
| Basements | 1 |
| Height | 75 m |
| Parking spaces | 187 |
| Land area | 1.9 acres (0.8 ha) |
| Built-up area | 37,630 m² (4,05,046 sq ft) |
| Plot area | 7,588 m² (81,676 sq ft) |
| Project cost | ₹84 crore |
| Village / locality | Bhayli |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08586 |
What the filings say
What is planned
Onyx Developers proposes a residential project named "Keystone Select" in Bhayli, Vadodara. The project report describes a development consisting of two residential towers, Tower A and Tower B, with a maximum height of 19 floors above ground.
The built-up area is planned across a basement, ground floor, and 19 upper floors. The 18th and 19th floors are designed as lower and upper penthouses respectively. The project includes a total of 36 residential units.
Amenities and Facilities
The ground floor and basement are planned to house various common facilities and services:
- Recreational: Swimming pool, splash pool, gym, yoga room, indoor games area, and a double-height badminton court.
- Social: Banquet hall, theater, library/work-from-home space, kids' play station, and a party lawn.
- Services: Admin office, conference room, driver lounge, servant rooms, and meter rooms.
Layout and design
The project is situated on a plot of 0.76 hectares (1.87 acres). The layout features two distinct towers with a central common plot area of 1,074.30 square metres. The ground floor layout includes a 26'6" wide driveway surrounding the central party lawn and building footprints.
Parking is distributed across the basement and ground levels. The applicant plans for a total of 185 car parking spaces, including 184 primary cars and 8 secondary cars. The project also incorporates Electric Vehicle (EV) charging infrastructure, with 4 rapid chargers capable of charging 48 cars per day.
Water, power and access
Water Supply
During the construction phase, the water requirement is estimated at 26.75 kilolitres per day (KLD), sourced via tankers. For the operational phase, the total water demand is approximately 40.2 KLD. Of this, 20.4 KLD will be fresh water supplied by the Vadodara Municipal Corporation (VMC), while 19.8 KLD will be recycled water from an on-site sewage treatment plant (STP).
Wastewater Management
The project is expected to generate 28.9 KLD of sewage. The applicant proposes an in-house STP with a capacity of 40 cubic metres per day using Membrane Bioreactor (MBR) technology. Treated water will be reused for flushing and gardening, with the remaining 9.1 KLD discharged into the VMC drainage line.
Power and Energy
The estimated connected load for the 36 flats is 252 kW. Power will be sourced from Madhya Gujarat Vij Company Limited (MGVCL). For backup, a Diesel Generator (DG) set with an acoustic enclosure will be installed.
Energy conservation measures include the installation of rooftop Photo-voltaic (PV) solar panels. The applicant plans to provide 208 square metres of solar panels (104 square metres per tower), expected to generate approximately 99 kW of energy.
Environmental safeguards
Landscaping and Greenbelt
The applicant plans to develop a greenbelt over 1,240 square metres, representing approximately 16.3% of the total plot area. This includes 860 square metres of lawn and 380 square metres of tree cover. A total of 190 trees are proposed to be planted, using native species such as Neem, Gulmohar, and Peepal.
Waste Management
During operation, the project is expected to generate 176 kg/day of solid waste. This will be segregated into organic (70.4 kg/day) and inorganic (105.6 kg/day) waste. Organic waste will be processed on-site using an Organic Waste Composter (OWC) with a 75 kg/day capacity, producing manure for the greenbelt. Inorganic waste will be collected through the VMC door-to-door system.
Rainwater Harvesting
To recharge groundwater, the plan includes two percolation wells. Rainwater from the roof surfaces will be channelized into catch basins with in-built recharge pits located around the project periphery.
Key Figures
| Item | Detail |
|---|---|
| Total Units | 36 Residential Flats |
| Max Floors | 19 Floors + Basement |
| Fresh Water Demand | 20.4 KLD |
| Sewage Generation | 28.9 KLD |
| STP Capacity | 40 KLD |
| Solar Power Provision | 208 sq. mt. |
| Total Parking Spaces | 185 Cars |
| Greenbelt Area | 1,240 sq. mt. |
| Excavated Earth | 25,000 cubic metres |
| CER Budget | ₹1.68 crore |
Residential Project Keystone Select site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.9 acres, this one is smaller than 52% of them.
65 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhayli, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Project "Keystone Clermont" — environmental approval granted, 400 m away
- Expansion of existing EC granted to Navrachana University and Navrachana… — environmental approval granted, 400 m away
- Nilamber Trillion — environmental approval granted, 450 m away
- Nilamber Trillion — withdrawn, 450 m away
- Samipya's Gold Coast — environmental approval granted, 450 m away
- Atrium — under environmental review, 500 m away
- Atrium — environmental approval granted, 500 m away
- Atrium — returned to applicant, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.