Samarpan Palace is an approved residential project in Vav, Kamrej, Surat, Gujarat. It plans 236 units in 4 towers of up to 14 floors on 1.2 acres. Its stated project cost is ₹31.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Jul 2025).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Samarpan Palace?

Samarpan Palace is an approved residential project in Vav, Kamrej, Surat, Gujarat. It plans 236 units in 4 towers of up to 14 floors on 1.2 acres.

Who is building it?

The applicant is Samarpan Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 23 Jul 2025), as of 27 Nov 2026.

Where is it?

In Vav, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹31.1 crore and a site of 1.2 acres.

When was it filed?

The application was filed on 19 Feb 2025.

Project details

StatusEnvironmental approval granted
Status since23 Jul 2025
Application filed19 Feb 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSamarpan Developers
UseResidential
Units236
Towers4
Floors (tallest)14
Basements2
Height45 m
Parking spaces288
Land area1.2 acres (0.5 ha)
Built-up area27,640 m² (2,97,514 sq ft)
Plot area4,865 m² (52,366 sq ft)
Project cost₹31.1 crore
Village / localityVav
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08699

What the filings say

What is planned

Samarpan Developers proposes the construction of a residential and commercial project named Samarpan Palace in Vav, Surat. The applicant's project report describes a single building with a ground floor and 14 upper floors, reaching a total height of 44.98 metres. The project is designed under the Residential Affordable Housing (RAH) category.

The building will contain 224 residential units and 12 commercial shops. The residential component is planned with four distinct unit types (A, B, C, and D), primarily consisting of 2BHK and 3BHK configurations. The ground floor is dedicated to commercial shops and building services, while the upper floors (1st to 14th) will house the residential apartments.

Key Figures

ItemDetail
Total Built-up Area27,640.22 sq.mt.
F.S.I. Area15,661.74 sq.mt.
Building Height44.98 metres
Total Residential Units224
Total Commercial Units12
Total FloorsGround + 14 floors
Basement Levels2 (Lower and Upper)

Layout and design

The project layout features a central building block with two basement levels for parking and services. The ground floor includes a foyer, lifts, and 12 shops facing the proposed 18.00-metre and 45.00-metre roads.

Parking is distributed across the ground level and two basement floors. The applicant has planned for a total parking area of 9,154.49 sq.mt., which includes 7,785.78 sq.mt. in the basements and 1,152.35 sq.mt. on the ground level. The design includes specific provisions for visitor parking and scooter parking for both residential and commercial occupants.

Land and surroundings

The project site occupies 0.49 hectares (1.21 acres) of land at Re Survey No. 639 in Vav village. The site is bounded by a 45.00-metre proposed road on one side and an 18.00-metre proposed road on another. The surrounding area consists of various sub-plots and survey numbers, including adjacent survey numbers 638, 640, and 984.

Water, power and access

Water requirements will be met through local municipal sources. For groundwater management, the applicant proposes a rainwater harvesting system featuring two percolating wells. These wells are designed with a 250 mm PVC slotted pipe and gravel filling to facilitate recharge.

Power will be sourced from the local grid, supplemented by a 70 KW rooftop solar energy system requiring 420 sq.mt. of terrace space. Emergency power will be provided by Diesel Generator (DG) sets, which will be housed in acoustic enclosures in the basement to minimize noise.

Environmental safeguards

The Environmental Management Plan (EMP) includes a total capital expenditure of ₹2.05 crore. Key components include:

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately four years. Installation of environmental management units will proceed parallel to the building construction.

Samarpan Palace site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Samarpan Palace: Site layout: building footprint, roads, and open spaces (preview)🔒 Sign in free to see it
Site layout: building footprint, roads, and open spaces
Samarpan Palace: Basement plans: upper and lower parking levels (preview)🔒 Sign in free to see it
Basement plans: upper and lower parking levels
Samarpan Palace: Building section and typical floor plan (preview)🔒 Sign in free to see it
Building section and typical floor plan
Samarpan Palace: Ground floor parking layout and entry points (preview)🔒 Sign in free to see it
Ground floor parking layout and entry points

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.

86 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vav, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.