Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Oct 2025 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Bluetex (I) Private Limited |
| Land area | 6.5 acres (2.6 ha) |
| Project cost | ₹94.3 crore |
| Village / locality | Bakrol |
| Taluk / tehsil | Anklesvar |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08770 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 5 Sept 2025 (this page) | Environmental approval granted | 6.5 acres | ₹94.3 crore |
| Expansion filed 28 Mar 2025 | Environmental approval granted | 6.5 acres | ₹94.3 crore |
| Early planning filed 18 Jul 2024 | Cleared for impact study | 6.5 acres | ₹94.3 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.5 acres, this one is larger than 59% of them.
226 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bakrol, Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Synthetic Organic Chemical Manufacturing unit (2,865 to… — environmental approval granted, 0 m away
- Proposed expansion of Synthetic Organic Chemical Manufacturing unit (2,865 to… — cleared for impact study, 0 m away
- Project by M/s. Cheminova (India) Ltd. (Technical Division) — initial checks, 300 m away
- Amendment in Existing Environment Clearance for Synthetic Organic Chemicals… — under environmental review, 400 m away
- Industrial project by EC Amendment of M/s. PI Industries Limited — lapsed, 400 m away
- Industrial project by M/s. Speqtus Industries — initial checks, 450 m away
- Shreemad Pharmachem — initial checks, 450 m away
- Industrial project by M/s. Dragnet chemicals Pvt. Ltd. — environmental approval granted, 500 m away
All 3 Bluetex projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.