What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

Shagun Heaven

Shagun Heaven is an approved residential project in Khadsad, Kamrej, Surat, Gujarat. It plans 251 units in 4 towers of up to 14 floors on 1.1 acres. Its stated project cost is ₹32 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Apr 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Shagun Heaven?

Shagun Heaven is an approved residential project in Khadsad, Kamrej, Surat, Gujarat. It plans 251 units in 4 towers of up to 14 floors on 1.1 acres.

Who is building it?

The applicant is Dholakia Himatlal Dhanji.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Apr 2026), as of 27 Nov 2026.

Where is it?

In Khadsad, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹32 crore and a site of 1.1 acres.

When was it filed?

The application was filed on 2 Dec 2025.

Project details

StatusEnvironmental approval granted
Status since1 Apr 2026
Application filed2 Dec 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDholakia Himatlal Dhanji
UseResidential
Units251
Towers4
Floors (tallest)14
Basements2
Parking spaces279
Land area1.1 acres (0.4 ha)
Built-up area29,062 m² (3,12,820 sq ft)
Plot area4,374 m² (47,081 sq ft)
Project cost₹32 crore
Village / localityKhadsad
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08832

What the filings say

What is planned

Shagun Heaven is a residential-cum-commercial project proposed by the applicant, Dholakia Himatlal Dhanji. The project consists of four buildings, designated as Blocks A, B, C, and D, each rising to a height of 14 floors above a hollow plinth and two basement levels (G+14).

The development is planned to include a total of 224 residential units and 27 commercial shops. The residential component is distributed across the four blocks as follows:

The commercial shops are located on the ground floor. The total built-up area for the project is 29,062.01 square metres, with the residential portion accounting for 28,300.85 square metres and the commercial portion for 761.16 square metres.

Layout and design

The site layout features the four residential blocks arranged around internal roads. Blocks A and B are situated towards the northern and eastern boundaries, while Blocks C and D are positioned towards the southern and western portions of the plot.

Internal access is provided by 6.00-metre-wide internal roads. The project includes two basement levels for parking and services. The first basement is at a level of -3.20 metres and the second basement is at -6.70 metres. A hollow plinth at the ground level provides additional parking and foyer space for each block.

ItemDetail
Total Units251 (224 Residential + 27 Commercial)
Tallest Building14 Floors (G+14)
Total Built-up Area29,062.01 sq. m.
F.S.I. Area17,465.10 sq. m.
Ground Coverage1,627.34 sq. m.
Common Plot Area444.34 sq. m.
Green Belt Area652.45 sq. m. (14.91%)

Water, power and access

The project's water requirement is estimated at 200 kilolitres per day (KLD). The applicant proposes to install a Moving Bed Biofilm Reactor (MBBR) type Sewage Treatment Plant (STP) with a capacity of 200 KLD to treat domestic effluent. Treated sewage will be discharged into the Surat Municipal Corporation (SMC) drainage system.

Power will be sourced from the local grid, supplemented by a 70 KW rooftop solar system covering 420 square metres of terrace space. Diesel Generator (DG) sets will be provided for emergency backup, located in the basement with acoustic enclosures. Access to the site is provided via an 18.00-metre-wide Town Planning (TP) road.

Parking is distributed across the two basements and the ground level. The residential parking requirement is 3,340.79 square metres, while the commercial requirement is 380.58 square metres. The applicant has proposed a total residential parking area of 8,182.83 square metres and a commercial parking area of 599.50 square metres.

Environmental safeguards

The applicant's Environmental Management Plan (EMP) includes a capital expenditure of ‣2.57 crore and a recurring annual cost of ‣35.07 lakh. Key components include:

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately three years. The installation of EMP units will proceed in parallel with the construction of the buildings.

Shagun Heaven site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Shagun Heaven: Site layout: building blocks, internal roads, and commercial shop locations (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and commercial shop locations
Shagun Heaven: Parking plan: basement and ground level parking arrangements (preview)🔒 Sign in free to see it
Parking plan: basement and ground level parking arrangements
Shagun Heaven: Building elevation and section: Blocks A and B (preview)🔒 Sign in free to see it
Building elevation and section: Blocks A and B
Shagun Heaven: Basement plans: first and second level layouts (preview)🔒 Sign in free to see it
Basement plans: first and second level layouts

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 79% of them.

136 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khadsad, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.