Project details
| Official title | Expansion of Grain Based Ethanol Plant From 250 Klpd to 325 Klpd by Enabling Usage of Mixture of Broken Rice & Maize, Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant at Village Baroda, Tehsil Matar, District Kheda, Gujarat by M/S Grainfuel Distilleries Private Limited |
|---|---|
| Status | Initial checks |
| Status since | 9 Aug 2025 |
| Application filed | 9 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Grainfuel Distilleries Private Limited |
| Use | Industrial |
| Land area | 35.1 acres (14.2 ha) |
| Plot area | 1,42,000 m² (15,28,474 sq ft) |
| Project cost | ₹350 crore |
| Village / locality | Baroda |
| Taluk / tehsil | Matar |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08923 |
In context
5 applications in Kheda since January 2022 are in the same category (Buildings & townships): 2 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Baroda, Matar, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 90/125mm Dia PE Gas pipeline Connectivity for Marala Village, Ta: Matar, Dist:… — forest land use approved, 5.9 km away
- Diversion of 0.6667 ha. Protected Forest land for the grant permission for… — more information requested, 6.7 km away
- Expansion by Drilling of Infill Oil and Gas Development Wells (20) in existing… — environmental approval granted, 7.7 km away
- No Increase in Pollution Load application for Synthetic Organic Chemicals… — initial checks, 9.1 km away
- Ganpati wood ply Industries — lapsed, 9.7 km away
- 90/125mm Dia PE Gas pipeline connectivity for Nayka Village, Ta: Kheda, Dist:… — forest land use approved, 10.1 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — under environmental review, 12.9 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — cleared for impact study, 12.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.