Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Sept 2025 |
| Application filed | 10 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Janaadhar Western Projects LLP |
| Use | Residential |
| Units | 846 |
| Towers | 7 |
| Floors (tallest) | 7 |
| Parking spaces | 166 |
| Land area | 4 acres (1.6 ha) |
| Built-up area | 57,081 m² (6,14,414 sq ft) |
| Plot area | 16,133 m² (1,73,654 sq ft) |
| Project cost | ₹102.1 crore |
| Village / locality | Sanand |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08928 |
What the filings say
What is planned
Janaadhar Sanand is a residential and commercial affordable housing project proposed by Janaadhar Western Projects LLP. The applicant intends to construct 11 building blocks (Blocks A to K) on a plot area of 16,133 square metres. The project has a proposed Floor Space Index (FSI) area of 38,610.78 square metres and a total built-up area of 55,412.95 square metres.
The development consists of 817 residential units and 29 commercial shops. The buildings are designed with a ground floor or hollow plinth for parking, followed by seven upper floors.
Unit and Block Distribution
| Block | Residential Units | Commercial Units | Floors |
|---|---|---|---|
| A+B | 115 | 20 | Ground + 7 |
| C | 86 | 9 | Ground + 7 |
| D | 72 | - | Ground + 7 |
| E | 72 | - | Ground + 7 |
| F | 86 | - | Ground + 7 |
| G | 72 | - | Ground + 7 |
| H+I | 130 | - | Ground + 7 |
| J+K | 154 | - | Ground + 7 |
| Total | 817 | 29 |
Layout and design
The site layout includes two common plots. Common Plot 1 (1,450.80 square metres) will house a clubhouse for society use, measuring 7.7 metres by 6.19 metres. Common Plot 2 covers 200.23 square metres. The project includes a 4.00-metre wide motorable open space for fire vehicle access and internal roads with a width of 6.00 metres.
Parking is provided in the hollow plinth and open surface areas, totaling 7,467.97 square metres. The design incorporates 20 lifts across the blocks, with specific allocations based on unit density (e.g., 4 lifts for Blocks A+B and 4 lifts for Blocks J+K).
Water, power and access
The total water requirement during the operation phase is estimated at 483 kilolitres per day (KLD). Of this, 316 KLD will be sourced from the Ahmedabad Urban Development Authority (AUDA) supply, while the remaining 181 KLD will be met through treated sewage. During the construction phase, water will be supplied by local tankers.
A sewage treatment plant (STP) with a capacity of 450 KLD using Activated Sludge Process technology is planned. Approximately 383 KLD of sewage will be treated, with 202 KLD discharged to the AUDA drainage line after internal reuse for gardening and flushing.
Power will be sourced from the local grid. For emergency backup, a 250 KVA diesel generator set is proposed. The project also includes a 220 kW rooftop solar power system covering 2,103.88 square metres of terrace space.
Environmental safeguards
The applicant plans to develop a greenbelt area of 853.93 square metres, which will include 404 trees. For waste management, an organic waste converter with a capacity of 1,000 kg per day (two units of 500 kg each) will be installed to treat 742 kg of wet waste daily. Dry waste, estimated at 1,112 kg per day, will be collected by AUDA.
Rainwater harvesting will be managed through five percolation wells. Dust mitigation during construction will involve 10-metre high windbreakers, water sprinkling, and tarpaulin covers for materials. The project budget includes ₹2.21 crore for capital expenditure on environmental management, including ₹1.07 crore for solar energy and ₹65 lakh for fire and safety systems.
Janaadhar Sanand site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4 acres, this one is larger than 84% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shubham Prime — environmental approval granted, 650 m away
- Diversion of 1.71 Ha of Protected Forest Land for Widening and Improvement of… — more information requested, 1.2 km away
- Eklingji Elysium — more information requested, 2.5 km away
- Eklingji Bilvam — more information requested, 2.6 km away
- Suramya Dreams — environmental approval granted, 2.6 km away
- Transfer of Environment Clearance for Synthetic Organic Chemicals (API &… — environmental approval granted, 2.7 km away
- Yogi Enterprise — initial checks, 2.7 km away
- Merger of three Synthetic Organic Chemicals manufacturing units and addition… — under environmental review, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.