What is Developing? Open the mapMap

LapsedMining · Porbandar, Gujarat

"Limestone Mining Project" having mine lease area 2.00 Ha located at Survey No. 152, Near Village: Ranavav, Tehsil: Ranavav, District: Porbandar, State: Gujarat with proposed production capacity: 1,55,109.72 TPA (ROM) by Sh. Balubhai Ramabhai Odedara

"Limestone Mining Project" having mine lease area 2.00 Ha located at Survey No. 152, Near Village: Ranavav, Tehsil: Ranavav, District: Porbandar, State: Gujarat with proposed production capacity: 1,55,109.72 TPA (ROM) by Sh. Balubhai Ramabhai Odedara is a lapsed mining project in Ranavav (M), Ranavav, Porbandar, Gujarat. The site covers 4.9 acres. Its stated project cost is ₹4.9 crore. As of 27 Nov 2026, its status is “Lapsed” (since 16 Jan 2026).

See it on the live map All projects in Porbandar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Limestone Mining Project" having mine lease area 2.00 Ha located at Survey No. 152, Near Village: Ranavav, Tehsil: Ranavav, District: Porbandar, State: Gujarat with proposed production capacity: 1,55,109.72 TPA (ROM) by Sh. Balubhai Ramabhai Odedara is a lapsed mining project in Ranavav (M), Ranavav, Porbandar, Gujarat. The site covers 4.9 acres.

Who is building it?

The applicant is Odedara Balubhai.

Has it been approved?

No. The application was lapsed on 16 Jan 2026, so it is no longer under consideration.

Where is it?

In Ranavav (M), Ranavav, Porbandar, Gujarat.

How big is it?

It has a stated cost of ₹4.9 crore and a site of 4.9 acres.

When was it filed?

The application was filed on 16 Dec 2025.

Project details

StatusLapsed
Status since16 Jan 2026
Application filed16 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantOdedara Balubhai
Land area4.9 acres (2 ha)
Project cost₹4.9 crore
Village / localityRanavav (M)
Taluk / tehsilRanavav
DistrictPorbandar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08935

In context

144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is larger than 81% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 9.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Ranavav (M), Ranavav, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.