Environmental approval grantedBuildings & townships · Bharuch, Gujarat

Shreepad Township -2

Shreepad Township -2 is an approved residential project in Andada (Ct), Anklesvar, Bharuch, Gujarat. It plans 635 units in 635 towers of up to 1 floors on 13.4 acres. Its stated project cost is ₹49 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Dec 2025).

See it on the live map All projects in Bharuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since10 Dec 2025
Application filed10 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantBabubhai Rambhai Ram
UseResidential
Units635
Towers635
Floors (tallest)1
Parking spaces1,270
Land area13.4 acres (5.4 ha)
Built-up area27,078 m² (2,91,465 sq ft)
Plot area54,289 m² (5,84,361 sq ft)
Project cost₹49 crore
Village / localityAndada (Ct)
Taluk / tehsilAnklesvar
DistrictBharuch
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08961

What the filings say

What is planned

Babubhai Rambhai Ram & Others propose to develop a residential project named Shreepad Township - 2 in Andada village, Ankleshwar. The applicant's project report describes the construction of a residential complex consisting of 635 single-story residential units (duplexes) on a plot area of 54,289.14 square metres.

The total built-up area is planned at 27,077.60 square metres. The project is designed as a residential township with a maximum building height of 4.0 metres, consisting of ground floor only. The layout includes various building types (A to O, including subtypes like E1, F1, G1, etc.) distributed across the site.

ItemDetail
Total Units635 residential units
Plot Area54,289.14 square metres (5.43 hectares)
Built-up Area27,077.60 square metres
Ground Coverage21,724.47 square metres (40%)
Maximum Height4.0 metres
Total ResidentsApproximately 2,695
Expected Visitors200 per day
Power Demand3,175 kW

Layout and design

The master plan indicates a series of internal roads providing access to the residential blocks. A minimum 6.0-metre wide internal road is provided for circulation, with some main internal roads reaching 7.5 metres in width. The project includes five common plots for open space, totaling 5,428.96 square metres.

Parking is planned as individual open parking within the duplex premises, providing a total of 1,270 Equivalent Car Spaces (ECS). The design incorporates energy-efficient features such as LED lighting in common areas, roof-top thermal insulation, and maximum utilization of natural light. Solar lighting is proposed for common areas, landscaping, and lift operations.

Land and surroundings

The project site is located at City Survey No. NA 629 in Andada, within the jurisdiction of the Bharuch Ankleshwar Urban Development Authority (BAUDA). The land is currently undeveloped. Soil investigations conducted in August 2025 found the strata to consist of dark brownish silty clay of high plasticity in the top 1.0 metre, followed by brownish silty clay of intermediate plasticity down to 10.0 metres.

Environmental sensitivity data shows the Narmada River is located approximately 5 km North-Northwest of the site. The Ankleshwar Railway Station is 4.0 km away in the Southwest direction, and the National Highway 48 (NH-48) is about 1.0 km to the South-Southeast. The site is situated in Seismic Zone III, indicating moderate seismic intensity.

Water, power and access

Water Supply: During the construction phase, a water demand of 22.75 kilolitres per day (KLD) will be met through tankers. For the operational phase, the total fresh water requirement is estimated at 243 KLD, to be supplied by BAUDA. Total water consumption, including recycled water for flushing and landscaping, is projected at 404.97 KLD.

Power: The expected power demand of 3,175 kW will be sourced from Madhya Gujarat Vij Company Limited (MGVCL). A 125 kVA diesel generator (DG) set is proposed for emergency backup, specifically for fire services, using High Speed Diesel (HSD) at a rate of 25 litres per hour.

Access: The project site is connected by a 12-metre wide road.

Environmental safeguards

A Sewage Treatment Plant (STP) with a capacity of 350 KLD using Moving Bed Biofilm Reactor (MBBR) technology is proposed. Treated wastewater will be reused for flushing (121 KLD) and gardening (41 KLD), with the surplus 147 KLD disposed of into the Dabhi Nagarpalika sewer line.

Solid waste generation during the operational phase is estimated at 1.6 tonnes per day. Biodegradable waste (approximately 539 kg/day) will be processed in an on-site Organic Waste Convertor with a 600 kg capacity. Non-biodegradable recyclable waste will be sold to authorized vendors. For storm water management, rain water harvesting systems are planned to recharge ground water.

Timeline

The applicant's registration under the Building and Other Construction Workers Act indicates a probable commencement date of July 1, 2025, with a projected completion date of April 30, 2027.

Shreepad Township -2 site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Shreepad Township -2: Site Plan: Layout of 635 residential units, internal roads, and common plots (preview)🔒 Sign in free to see it
Site Plan: Layout of 635 residential units, internal roads, and common plots
Shreepad Township -2: Project details and area statement summary (preview)🔒 Sign in free to see it
Project details and area statement summary
Shreepad Township -2: Location map showing project site and surrounding 10km study area (preview)🔒 Sign in free to see it
Location map showing project site and surrounding 10km study area
Shreepad Township -2: Water balance diagram for the operational phase (preview)🔒 Sign in free to see it
Water balance diagram for the operational phase

In context

58 applications in Bharuch since January 2022 are in the same category (Buildings & townships): 34 approved, 12 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 13.4 acres, this one is larger than 68% of them.

286 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Andada (Ct), Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.