Quick answers
What is Capital Sivesta?
Capital Sivesta is an approved residential project in Randesan, Gandhinagar, Gujarat. It plans 138 units in 1 tower of up to 14 floors on 1 acre.
Who is building it?
The applicant is Span Infrastructure.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 May 2025), as of 27 Nov 2026.
Where is it?
In Randesan, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹40.7 crore and a site of 1 acre.
When was it filed?
The application was filed on 4 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Capital Sivesta
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 May 2025 |
| Application filed | 4 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Span Infrastructure |
| Use | Residential |
| Units | 138 |
| Towers | 1 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 259 |
| Land area | 4,000 m² |
| Built-up area | 26,906 m² (2,89,613 sq ft) |
| Plot area | 4,011 m² (43,174 sq ft) |
| Project cost | ₹40.7 crore |
| Village / locality | Randesan |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09182 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 Jun 2025 | Environmental approval granted | 1 acre | ₹40.7 crore |
| New project filed 4 Jan 2025 (this page) | Environmental approval granted | 1 acre | ₹40.7 crore |
What the filings say
What is planned
Span Infrastructure proposes the construction of a residential project named Capital Sivesta in Randesan, Gandhinagar. According to the applicant's project report and environmental clearance documents, the development will consist of a single building block with three wings (Block A, B, and C). The structure is planned to have two basements, a ground floor (hollow plinth) for parking, and 14 residential floors.
The project is designed to accommodate 138 residential units. The building will reach a maximum height of 44.94 metres.
Project Components and Capacities
| Item | Detail |
|---|---|
| Total Plot Area | 4,011.00 square metres (0.4 hectares) |
| Total Built-up Area | 27,307.25 square metres |
| Total Residential Units | 138 |
| Building Configuration | 2 Basements + Ground + 14 Floors |
| Maximum Building Height | 44.94 metres |
| Total Parking Space | 7,959.56 square metres (259 CPS) |
| Common Plot Area | 404.55 square metres |
Layout and design
The layout plan shows a central common plot of 404.55 square metres surrounded by internal roads. The building wings are arranged around this central space. Access to the site is provided through separate entry and exit gates on an 18.00-metre wide internal road.
Internal circulation is managed by 6.00-metre to 7.00-metre wide roads. The project includes six lifts in total, comprising three passenger lifts and three fire lifts. Each floor is designed with a travel distance of less than 20 metres to the nearest staircase.
Parking is distributed between the two basements (6,267.32 square metres) and the hollow plinth at the ground level (1,692.24 square metres). The basements are designed with a height greater than 4.5 metres to allow for future mechanical parking systems.
Water, power and access
The Gandhinagar Municipal Corporation (GMC) will be the primary source for water and waste disposal.
- Water: During the operation phase, the total water requirement is estimated at 115.25 kilolitres per day (KLD). This includes 58.75 KLD of fresh water from GMC and 56.50 KLD of recycled treated sewage for flushing and gardening. During construction, 12.25 KLD will be required.
- Sewage: The project will generate approximately 90 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 120 KLD.
- Power: Electricity will be sourced from the local grid. A 160 KVA Diesel Generator (DG) set is planned for emergency backup. The applicant has committed to installing a 70 KW solar power system on the rooftop.
Environmental safeguards
The applicant has proposed an Environmental Management Plan (EMP) with a capital budget of ₹241.40 lakh. Key measures include:
- Waste Management: An on-site Organic Waste Converter (OWC) with a capacity of 199 kg/day will treat organic waste. Recyclable materials will be sold to vendors.
- Rainwater Harvesting: Two percolation wells are planned to recharge groundwater. Rooftop rainwater will be collected in an RCC tank for reuse in gardening and firefighting.
- Greenbelt: A total of 635.55 square metres (15.85% of the plot) is allocated for green cover, including a 404.55 square metre lawn and a 231.00 square metre tree plantation area. The plan includes planting 110 trees of native species such as Neem, Gulmohar, and Pipal.
- Air and Noise: Dust mitigation during construction includes 15-foot high barricading, water sprinkling, and covering transport vehicles. The DG set will be equipped with acoustic enclosures.
Corporate Environment Responsibility
The applicant has allocated ₹82.5 lakh for Corporate Environment Responsibility (CER) activities over three years. These activities are planned for the nearby villages of Prantiya, Vajapura, and Pundrasan. Proposed works include the installation of 12 KW solar rooftop systems at gram panchayats and schools, the construction of six percolating wells for groundwater recharge, and the installation of 20 solar-powered street lights in Prantiya village.
Capital Sivesta site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 80% of them.
190 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Randesan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Capital Sivesta — environmental approval granted, 0 m away
- The Empyrean — environmental approval granted, 50 m away
- The Empyrean — environmental approval granted, 50 m away
- "the Empyrean" — environmental approval granted, 50 m away
- Ayunam Sarita — environmental approval granted, 50 m away
- Evara — environmental approval granted, 50 m away
- Harsiddh Heartland — environmental approval granted, 100 m away
- Pramukh Omkar Rivanta-2 — environmental approval granted, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.