Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Aug 2025 |
| Application filed | 28 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Trisha Infrastructure Limited |
| Use | Mixed use |
| Units | 88 |
| Towers | 4 |
| Floors (tallest) | 11 |
| Basements | 2 |
| Height | 39 m |
| Parking spaces | 199 |
| Land area | 1.1 acres (0.4 ha) |
| Built-up area | 25,352 m² (2,72,886 sq ft) |
| Plot area | 4,346 m² (46,780 sq ft) |
| Project cost | ₹35 crore |
| Village / locality | Dantesar |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09252 |
In context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.1 acres, this one is smaller than 92% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dantesar, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Samruddhi Saffron — cleared for impact study, 1.4 km away
- Samruddhi Saffron — environmental approval granted, 1.4 km away
- Proposed Residential & Commercial Project "Narayan Township-1" — environmental approval granted, 1.9 km away
- Sundaram Status — environmental approval granted, 2.6 km away
- Shree Siddheshwar Happy Land — lapsed, 2.6 km away
- Zillion Splendid 2 — environmental approval granted, 2.7 km away
- Kesar Bhagwat — environmental approval granted, 2.7 km away
- Protected Forest Land for Construct of Approach Road (entry and exit) for set… — in-principle approval, conditions pending, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.