What is Developing? Open the mapMap

Cleared for impact studyIndustry · Valsad, Gujarat

Proposed expansion of project for manufacturing of Synthetic Organic Chemicals (Dyes Intermediates & Resins) in existing unit located at Plot No: C1B-52 & 53, LIC sector, GIDC Estate, Vapi-396195, Tal: Vapi, Dist.: Valsad, Gujarat by M/s Kamala Intermediates

Proposed expansion of project for manufacturing of Synthetic Organic Chemicals (Dyes Intermediates & Resins) in existing unit located at Plot No: C1B-52 & 53, LIC sector, GIDC Estate, Vapi-396195, Tal: Vapi, Dist.: Valsad, Gujarat by M/s Kamala Intermediates is a proposed industrial project in Vapi, Valsad, Gujarat. The site covers 0.4 acres. Its stated project cost is ₹3 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Feb 2025).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of project for manufacturing of Synthetic Organic Chemicals (Dyes Intermediates & Resins) in existing unit located at Plot No: C1B-52 & 53, LIC sector, GIDC Estate, Vapi-396195, Tal: Vapi, Dist.: Valsad, Gujarat by M/s Kamala Intermediates is a proposed industrial project in Vapi, Valsad, Gujarat. The site covers 0.4 acres.

Who is building it?

The applicant is M/s Kamala Intermediates.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Feb 2025), as of 27 Nov 2026.

Where is it?

In Vapi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹3 lakh and a site of 0.4 acres.

When was it filed?

The application was filed on 14 Feb 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of project for manufacturing of Synthetic Organic Chemicals (Dyes…

Project details

StatusCleared for impact study
Status since17 Feb 2025
Application filed14 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantM/s Kamala Intermediates
Land area1,700 m²
Project cost₹3 lakh
Village / localityVapi
Taluk / tehsilVapi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09409

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 26 Dec 2025Environmental approval granted0.4 acres₹3 lakh
Early planning filed 14 Feb 2025 (this page)Cleared for impact study0.4 acres₹3 lakh

In context

283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 83% of them.

216 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.