One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Synthetic Organic Chemicals Manufacturing Unit of M/s. Kashi Chemzone Private…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Sept 2025 |
| Application filed | 25 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kashi Chemzone Private Limited |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹5 crore |
| Village / locality | Patiyali |
| Taluk / tehsil | Gondal |
| District | Rajkot |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09461 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Mar 2026 | Environmental approval granted | 2.4 acres | ₹5 crore |
| Early planning filed 25 Aug 2025 (this page) | Cleared for impact study | 2.4 acres | ₹5 crore |
In context
66 applications in Rajkot since January 2022 are in the same category (Industry): 50 approved, 8 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.4 acres, this one is larger than 54% of them.
Where it is
Patiyali, Gondal, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals Manufacturing Unit of M/s. Kashi Chemzone… — environmental approval granted, 0 m away
- Mining project by M/S Ambaji Stone Crusher — not approved, 7 km away
- Laying UG OFC Cable in Gondal & Kotda Sangani taluka of Rajkot dist. — forest land use approved, 7.9 km away
- Shri Jadeja Rajendrasingh Chhatrsingh — environmental approval granted, 8.2 km away
- Laying UG OFC Cable in Gondal taluka of Rajkot dist. — forest land use approved, 8.6 km away
- Shri Nilesh Prabhudas Tanna — environmental approval granted, 8.6 km away
- Industrial project by M/s. Lenient Lifecare Private Limited — under environmental review, 8.6 km away
- Gondal Group Water Supply Scheme (Mahi pipeline based) Augmentation — forest land use approved, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.