Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Mar 2025 |
| Application filed | 13 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S. Salvi Chemical Industries LTD. (Drug and Intermediates) |
| Land area | 20.9 acres (8.5 ha) |
| Project cost | ₹117 crore |
| Village / locality | Vagra |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09536 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 26 Jul 2025 | Environmental approval granted | 20.9 acres | ₹117 crore |
| Early planning filed 13 Feb 2025 (this page) | Cleared for impact study | 20.9 acres | ₹117 crore |
| Early planning filed 13 Jul 2023 | Cleared for impact study | 20.9 acres | ₹133.6 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20.9 acres, this one is larger than 78% of them.
307 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED EXPANSION PROJECT FOR SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT… — environmental approval granted, 0 m away
- PROPOSED EXPANSION PROJECT FOR SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT… — cleared for impact study, 150 m away
- Raw Water Pipeline laying for Galanda Reservoir to D-II. — lapsed, 200 m away
- Transfer of Environment Clearance from M/s. Pragna Healthcare Pvt Ltd to M/s.… — environmental approval granted, 250 m away
- Proposed expansion project for settling of Captive Co-Gen Power Plant by M/s.… — environmental approval granted, 350 m away
- Proposed 8"Ø Steel Gas Pipeline from Tap-off Point(on Ex.8"Ø Steel Gas… — lapsed, 400 m away
- Project by Crop Life Science Ltd. (old Name Hetban Spechem Ltd.) — initial checks, 800 m away
- Project by Crop Life Science LTD. — initial checks, 800 m away
All 3 Salvi Chemical Industries projects across India