Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Dec 2025 |
| Application filed | 12 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jayeshkumar Chandulal Prajapati |
| Use | Mixed use |
| Units | 248 |
| Towers | 2 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Parking spaces | 355 |
| Land area | 1.7 acres (0.7 ha) |
| Built-up area | 46,950 m² (5,05,365 sq ft) |
| Plot area | 6,703 m² (72,150 sq ft) |
| Project cost | ₹55 crore |
| Village / locality | Godhavi |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09551 |
What the filings say
What is planned
Sun Mayfair is a proposed residential and commercial project by Jayeshkumar Chandulal Prajapati. According to the applicant's conceptual plans, the development will consist of four blocks (A, B, C, and D) with a building configuration of two basements, a ground floor, and 14 upper floors (G+14).
The project is designed to accommodate a total of 248 units. This includes 208 residential apartments and 40 commercial units. The residential component is distributed across the four blocks, while the commercial units are located on the ground and first floors. The total built-up area for the project is 46,849.53 square metres.
Project Components
| Item | Detail |
|---|---|
| Total Units | 248 (208 Residential, 40 Commercial) |
| Building Configuration | 2 Basements + Ground + 14 Floors |
| Total Built-up Area | 46,849.53 sq. m. |
| FSI Area Utilized | 29,685.62 sq. m. |
| Common Plot Area | 705.46 sq. m. |
| Parking Area (Basements) | 10,199.83 sq. m. |
Layout and design
The site layout features four interconnected blocks arranged around a central common plot of 705.46 square metres (0.07 hectares). The ground level includes a hollow plinth for parking, security control rooms, and society common amenities.
Vertical circulation is provided through two lifts per block, including one designated fire lift. The design incorporates a 6.00-metre wide approach road within the premises. Parking is provided across two basement levels and the ground floor plinth. The applicant has committed to providing 100% 'EV ready' parking spaces with conduits installed for electric vehicle charging.
Water, power and access
The project's water requirement during the operational phase is estimated at 220.22 kilolitres per day (KLD). Of this, 148.21 KLD will be fresh water, while 72.01 KLD will be met through treated wastewater. Wastewater generation is projected at 173.64 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 200 KLD. Treated water will be reused for flushing and horticulture.
Stormwater management includes a collection system through piped drains leading to two percolation wells for groundwater recharge. The annual recharge of groundwater is estimated at approximately 2,800 cubic metres.
Power will be supplied by the local grid, supported by a diesel generator (DG) set for emergency backup. The project includes a dedicated electric substation and meter rooms on the ground floor.
Environmental safeguards
The applicant has budgeted ₹91.5 lakh for capital expenditure on environmental protection and ₹10 lakh for annual recurring costs. Mitigation measures include:
- Air Quality: Regular water sprinkling during construction and the use of properly tuned machinery. A greenbelt will be developed along the periphery and internal roads.
- Noise Control: Provision of ear mufflers for construction workers and acoustic enclosures for the DG set.
- Waste Management: Segregation of solid waste into organic and inorganic components. Bio-degradable waste will be converted to compost using an on-site Organic Waste Converter (OWC).
- Greenbelt: A two-phase plantation plan using evergreen and fast-growing trees at 3.0-metre and 6.0-metre intervals.
Environmental Budget
| Head | Capital Cost (₹ lakh) | Recurring Cost (₹ lakh/year) |
|---|---|---|
| Air Pollution Control | 21.0 | 1.5 |
| Noise Control | 15.0 | 0.5 |
| Water (STP) | 30.0 | 2.5 |
| Solid Waste Management | 18.0 | 2.0 |
| Environmental Monitoring | 2.5 | 2.5 |
| Rainwater Harvesting | 2.0 | 0.5 |
| Greenbelt Development | 3.0 | 0.5 |
| Total | 91.5 | 10.0 |
Sun Mayfair site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.7 acres, this one is larger than 54% of them.
171 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Godhavi, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vin Heaven — under environmental review, 100 m away
- The Landing — initial checks, 400 m away
- Niwa-2 Project — environmental approval granted, 550 m away
- The One — environmental approval granted, 550 m away
- The One — environmental approval granted, 550 m away
- Akalpya — environmental approval granted, 950 m away
- Turquoise Glamouere — environmental approval granted, 1.1 km away
- Turquoise Glamouere — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.