Quick answers
What is this project?
Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) is a proposed water and irrigation project in Umedpura, Danta, Banas Kantha, Gujarat. The site covers 375.9 acres.
Who is building it?
The applicant is Gujarat State Electricity Corporation Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Oct 2026), as of 27 Nov 2026.
Where is it?
In Umedpura, Danta, Banas Kantha, Gujarat.
How big is it?
It has a stated cost of ₹7,496.5 crore and a site of 375.9 acres.
When was it filed?
The application was filed on 9 Sept 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Oct 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Water & irrigation |
| Applicant | Gujarat State Electricity Corporation Limited |
| Land area | 375.9 acres (152.1 ha) |
| Project cost | ₹7,496.5 crore |
| Village / locality | Umedpura |
| Taluk / tehsil | Danta |
| District | Banas Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09836 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umedpura, Danta, Banas Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) — forest land use approved, 750 m away
- Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) — lapsed, 750 m away
- Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) — cleared for impact study, 750 m away
- Construction of Jorapura to Umedpura Road — more information requested, 1.7 km away
- Construction of Jorapura to Umedpura Road — lapsed, 1.7 km away
- Samrapur Building Stone Survey No 159 Paiki — not approved, 6.3 km away
- Samrapur Building Stone_891 AN — not approved, 6.3 km away
- Samrapur Building Stone Mine Survey No 159 Paiki AN — not approved, 6.3 km away
More from Gujarat State Electricity Corporation Limited in Banas Kantha
- Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) — forest land use approved
- Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) — lapsed
- Dharoi Off-Stream Open loop Pumped Storage Hydro Electric Project (500 MW) — cleared for impact study
4 Gujarat State Electricity Corporation projects in Banas Kantha
All 25 Gujarat State Electricity Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.