What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Rajkot, Gujarat

Proposed Expansion of Residential Cum Commercial Building Construction Project Aishwaryam Gardens 2 by Bharatbhai Nanjibhai Korat & Others

Proposed Expansion of Residential Cum Commercial Building Construction Project Aishwaryam Gardens 2 by Bharatbhai Nanjibhai Korat & Others is a proposed mixed-use project in Mavdi, Rajkot, Gujarat. It plans 696 units in 9 towers of up to 20 floors on 7.7 acres. Its stated project cost is ₹239.5 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 13 Aug 2026).

See it on the live map All projects in Rajkot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since13 Aug 2026
Application filed29 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantBharat Nanjibhai Korat
UseMixed use
Units696
Towers9
Floors (tallest)20
Basements3
Height77 m
Parking spaces1,720
Land area7.7 acres (3.1 ha)
Built-up area2,24,762 m² (24,19,316 sq ft)
Plot area31,228 m² (3,36,135 sq ft)
Project cost₹239.5 crore
Village / localityMavdi
Taluk / tehsilRajkot
DistrictRajkot
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09893

In context

134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.7 acres, this one is larger than 95% of them.

92 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mavdi, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharat Nanjibhai Korat in Rajkot

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.