Quick answers
What is Mining project by Bajaj Earths Pvt. Ltd?
This proposed mining project by Bajaj Earths Pvt. Ltd is in Dhaneti, Bhuj, Kachchh, Gujarat. The site covers 12.2 acres.
Who is building it?
The applicant is Bajaj Earths Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Dhaneti, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹14.8 crore and a site of 12.2 acres.
When was it filed?
The application was filed on 8 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 8 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bajaj Earths Private Limited |
| Land area | 12.2 acres (4.9 ha) |
| Project cost | ₹14.8 crore |
| Village / locality | Dhaneti |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09916 |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.2 acres, this one is larger than 92% of them.
No other mining lease on record is within 500 m of this site; 38 have applied within 5 km.
Where it is
Dhaneti, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Roadside Protected Forest Land to Construct of Approach Roads and… — forest land use approved, 1.9 km away
- Industrial project by M/s. Ajit Industries West Pvt. Ltd. — cleared for impact study, 2.1 km away
- Industrial project by M/s. Ajit Industries West Pvt. Ltd. — cleared for impact study, 2.1 km away
- Proposed Expansion of Pipes and Tubes Manufacturing Unit of M/s. Venus Pipes… — cleared for impact study, 2.2 km away
- Diversion of Protected Forest Land to Construct 4 Approach Roads — lapsed, 2.5 km away
- Diversion of 47.195 ha. PF Land for improvement and widening of Bhuj – Bhachau… — more information requested, 2.6 km away
- Shri Thakkar Hiren Tulasidas — environmental approval granted, 2.6 km away
- Shri Thakkar Hiren Tulasidas — cleared for impact study, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.