What is Developing? Open the mapMap

WithdrawnIndustry · Kachchh, Gujarat

Proposed Expansion of Steel Tubes & Pipes from 72,000 TPA to 4,92,000 TPA, Fabricated and Painted Structure from 18,000 TPA to 90,000 TPA and Installation of New Coil Pickling Unit 20,000 TPA

Proposed Expansion of Steel Tubes & Pipes from 72,000 TPA to 4,92,000 TPA, Fabricated and Painted Structure from 18,000 TPA to 90,000 TPA and Installation of New Coil Pickling Unit 20,000 TPA is a withdrawn industrial project in Sikara, Bhachau, Kachchh, Gujarat. The site covers 53.1 acres. Its stated project cost is ₹360.8 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 28 May 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Steel Tubes & Pipes from 72,000 TPA to 4,92,000 TPA, Fabricated and Painted Structure from 18,000 TPA to 90,000 TPA and Installation of New Coil Pickling Unit 20,000 TPA is a withdrawn industrial project in Sikara, Bhachau, Kachchh, Gujarat. The site covers 53.1 acres.

Who is building it?

The applicant is Goodluck India Limited.

Has it been approved?

No. The application was withdrawn on 28 May 2026, so it is no longer under consideration.

Where is it?

In Sikara, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹360.8 crore and a site of 53.1 acres.

When was it filed?

The application was filed on 28 May 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Steel Tubes & Pipes from 72,000 TPA to 4,92,000 TPA, Fabricated…

Project details

Official titleProposed Expansion of Steel Tubes & Pipes from 72,000 TPA to 4,92,000 TPA, Fabricated and Painted Structure from 18,000 TPA to 90,000 TPA and Installation of New Coil Pickling Unit 20,000 TPA along with existing Continuous Galvanized (CGI) Sheets 72,000 TPA and Steel Tubes Pipes 48,000 TPA By M/s. Goodluck Metallics (Unit of Goodluck India Limited)
StatusWithdrawn
Status since28 May 2026
Application filed28 May 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantGoodluck India Limited
Land area53.1 acres (21.5 ha)
Project cost₹360.8 crore
Village / localitySikara
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09961

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 24 Jun 2026Environmental approval granted53.1 acres₹360.8 crore
Expansion filed 28 May 2026 (this page)Withdrawn53.1 acres₹360.8 crore
Early planning filed 25 Feb 2025Cleared for impact study53.1 acres₹360.8 crore

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 53.1 acres, this one is larger than 53% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sikara, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Goodluck India Limited in Kachchh

All 5 Goodluck India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.