Project details
| Official title | Setting Up of Greenfield Project for Manufacturing Facility of "All type of Power Transformer" by Hitachi Energy India Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 May 2026 |
| Application filed | 9 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hitachi Energy India Limited |
| Use | Industrial |
| Towers | 17 |
| Floors (tallest) | 3 |
| Parking spaces | 85 |
| Land area | 40 acres (16.2 ha) |
| Built-up area | 66,382 m² (7,14,529 sq ft) |
| Plot area | 1,61,874 m² (17,42,396 sq ft) |
| Project cost | ₹1,687.7 crore |
| Village / locality | Kandari |
| Taluk / tehsil | Karjan |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10011 |
In context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 40 acres, this one is larger than 95% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kandari, Karjan, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Change in Product Mix for the Manufacturing of Synthetic Organic… — initial checks, 3.4 km away
- Widening & Straightening of Karjan - Kayavarohan Road (SH-161) CH: 00+000 Km… — more information requested, 3.5 km away
- Diversion of 0.10745 Ha. Protected Forest Land for the Work of Laying of 66 KV… — forest land use approved, 4 km away
- Diversion of 0.064 Ha. Protected Forest Land for the work of laying of 66kV… — lapsed, 4.6 km away
- 0.10875 Ha. of protected forest land for the under construction of 132kV D/C,… — more information requested, 4.7 km away
- Industrial project by Arvalli Castor Products Private Limited — under environmental review, 6.3 km away
- Diversion of 3.0910 Ha. Protected Forest land For Widening of… — lapsed, 6.8 km away
- Shri Bharodia Mansukhbhai Kalubhai — environmental approval granted, 9.4 km away
All 4 Hitachi Energy India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.