Quick answers
What is this project?
Kenedy Bauxite Mining Project of M/s Imperial Mining Syndicate is a withdrawn mining project in Kenedi, Kalyanpur, Devbhumi Dwarka, Gujarat. The site covers 3.1 acres.
Who is building it?
The applicant is Imperial Syndicate.
Has it been approved?
No. The application was withdrawn on 13 Apr 2026, so it is no longer under consideration.
Where is it?
In Kenedi, Kalyanpur, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹1 crore and a site of 3.1 acres.
When was it filed?
The application was filed on 13 Apr 2026.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 13 Apr 2026 |
| Application filed | 13 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Imperial Syndicate |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹1 crore |
| Village / locality | Kenedi |
| Taluk / tehsil | Kalyanpur |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10028 |
In context
171 applications in Devbhumi Dwarka since January 2022 are in the same category (Mining): 103 approved, 44 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.1 acres, this one is smaller than 74% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kenedi, Kalyanpur, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shivhari Minerals, Kenedy Bauxite and Laterite Block-04 for an area… — environmental approval granted, 2.8 km away
- Shivhari Minerals, Kenedy Bauxite and Laterite Block-04 for an area… — cleared for impact study, 2.8 km away
- Sarswati Mineral - (Block-01) — more information requested, 3 km away
- Hardasbhai Khimabhai Chetariya-(Block-02) — initial checks, 3 km away
- Hardasbhai Khimabhai Chetariya-(Block-02) — under environmental review, 3 km away
- Sarswati Mineral-(Block-03) — under environmental review, 3.3 km away
- Sarswati Mineral-(Block-03) — cleared for impact study, 3.3 km away
- Rajshakti Enterprise Pro. Kishorsinh Ramsang Jadeja (Hadmatiya Block 1) — under environmental review, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.