One of 3 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Ghanshyam Intermediates
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Aug 2026 |
| Application filed | 1 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Ghanshyam Intermediates |
| Land area | 1,000 m² |
| Project cost | ₹1 crore |
| Village / locality | Nandesari |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10409 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 1 Jul 2026 (this page) | Lapsed | 0.2 acres | ₹1 crore |
| Expansion filed 26 Mar 2026 | Under environmental review | 0.2 acres | ₹1 crore |
| Early planning filed 1 Feb 2025 | Cleared for impact study | 0.2 acres | ₹1 crore |
In context
178 applications in Vadodara since January 2022 are in the same category (Industry): 91 approved, 71 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 95% of them.
91 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandesari, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Ghanshyam Intermediates — under environmental review, 0 m away
- Industrial project by M/s. Ghanshyam Intermediates — cleared for impact study, 0 m away
- Industrial project by M/s. Shreeji Intermediate — returned to applicant, 50 m away
- Industrial project by M/s. Shreeji Intermediate — environmental approval granted, 50 m away
- Industrial project by M/s. Shreeji Intermediate — returned to applicant, 50 m away
- Industrial project by M/s. Shreeji Intermediate — cleared for impact study, 50 m away
- Public facility by M/s. Kalki Healthcare Private Limited — initial checks, 150 m away
- Proposed new project for manufacturing of Synthetic Organic Chemical by M/s.… — environmental approval granted, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.