Project details

StatusEnvironmental approval granted
Status since30 Oct 2026
Application filed6 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSangeeta Anandrao Gaekwar
UseMixed use
Units211
Towers5
Floors (tallest)10
Basements1
Height33 m
Parking spaces260
Land area1.3 acres (0.5 ha)
Built-up area22,091 m² (2,37,785 sq ft)
Plot area5,140 m² (55,326 sq ft)
Project cost₹59 crore
Village / localityBhayli
Taluk / tehsilVadodara Rural
DistrictVadodara
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10428

What the filings say

What is planned

Courtyard Enclave is a residential and commercial development proposed by Sangeeta Anandrao Gaekwar in Bhayli, Vadodara. The applicant's project report describes the construction of five buildings on a plot of 5,139.67 square metres. The complex will consist of a basement, a hollow plinth, and 10 upper floors, reaching a maximum height of 33 metres.

The project includes 196 residential flats and 15 commercial shops. The total built-up area is planned at 22,090.55 square metres.

Project Components

ItemDetail
Plot Area5,139.67 sqm
Built-up Area22,090.55 sqm
Number of Blocks5 Buildings
Total Units196 Flats, 15 Shops
FloorsB + G/P + 10
Maximum Height33.00 m
Power Requirement1,800.80 kW
Backup Power3 x 125 kVA DG sets

Layout and design

The site layout includes a 15-metre wide main road for access and minimum 6-metre wide internal roads for circulation. The ground coverage is 1,753.78 square metres, representing 34.12% of the plot.

Parking is planned across multiple levels with a total area of 5,564.06 square metres, providing space for 260 Equivalent Car Spaces (ECS). This includes mechanical parking in the basement (4,046.01 sqm for 201 ECS), hollow plinth parking (966.05 sqm for 35 ECS), and open parking (552 sqm for 24 ECS).

Land and surroundings

The project is located in Bhayli, within the limits of the Vadodara Mahanagar Seva Sadan (VMSS). The site is currently undeveloped and flat, with no wetlands or low-lying areas in the vicinity. The surrounding area is categorized as Seismic Zone III, indicating moderate seismic intensity.

Nearby landmarks include Sterling Hospital (0.5 km), Bright Day Center (0.5 km), and the Vishwamitri River (4 km). The Vadodara Railway Station is approximately 6 km away, and the airport is 10 km from the site.

Water, power and access

During the operational phase, the total fresh water requirement is estimated at 95 kilolitres per day (KLD), to be supplied by VMSS. The total water demand, including recycled water for flushing and gardening, is 149 KLD.

Wastewater generation is projected at 124 KLD. The applicant proposes an on-site Sewage Treatment Plant (STP) with a capacity of 150 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (49 KLD) and landscaping (4 KLD), with the remaining 70 KLD discharged into the municipal sewer line.

Power will be sourced from Madhya Gujarat Vij Company Limited (MGVCL). For emergencies, three diesel generator sets of 125 kVA each are planned, dedicated to fire services. Solar energy will be utilized for common area lighting and lifts, with a proposed 91.26 kW rooftop solar system.

Environmental safeguards

The project includes a greenbelt area of 775 square metres, where approximately 130 trees will be planted. For storm water management, two percolation wells are planned to recharge an estimated 4,000 cubic metres of groundwater annually.

Solid waste generation is estimated at 0.6 tonnes per day. An organic waste converter with a capacity of 250 kg per day will process biodegradable waste, while recyclable materials will be sold to authorized vendors. Dust mitigation during construction will involve water sprinkling twice daily and 10-metre high windbreakers at the site periphery.

Timeline

The applicant's registration under the Building and Other Construction Workers Act indicates a probable commencement date of 1 May 2026, with a completion target of 31 October 2026.

Courtyard Enclave site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Courtyard Enclave: Site layout: building blocks, internal roads, and parking areas (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and parking areas
Courtyard Enclave: Conceptual plan summary with area and unit details (preview)🔒 Sign in free to see it
Conceptual plan summary with area and unit details
Courtyard Enclave: Location map showing project site and surrounding study area (preview)🔒 Sign in free to see it
Location map showing project site and surrounding study area
Courtyard Enclave: Water balance diagram for the operational phase (preview)🔒 Sign in free to see it
Water balance diagram for the operational phase

In context

179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.3 acres, this one is smaller than 80% of them.

73 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhayli, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.