Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 9 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Lupin Limited |
| Land area | 37.4 acres (15.1 ha) |
| Project cost | ₹614 crore |
| Village / locality | Ankleshvar (M) |
| Taluk / tehsil | Anklesvar |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10705 |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 37.4 acres, this one is larger than 86% of them.
296 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ankleshvar (M), Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Tagros Chemicals India Private Limited. — initial checks, 200 m away
- Industrial project by M/s. Tagros Chemicals India Private Limited. — environmental approval granted, 200 m away
- Industrial project by M/s. Tagros Chemicals India Private Limited. — cleared for impact study, 200 m away
- Industrial project by M/s. Elantas Beck India Limited — returned to applicant, 350 m away
- Proposed modernization in existing Synthetic Organic Chemicals unit of M/s.… — returned to applicant, 450 m away
- Proposed modernization in existing Synthetic Organic Chemicals unit of M/s.… — cleared for impact study, 450 m away
- Industrial project by M/s. Acutaas Chemicals Limited (Unit-2) — environmental approval granted, 500 m away
- Project by M/s. Ami organics Limited (Unit-2) — initial checks, 500 m away
All 10 Lupin projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.