Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 2 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Samarth Buildcon |
| Use | Residential |
| Units | 140 |
| Towers | 2 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Parking spaces | 199 |
| Land area | 3,600 m² |
| Built-up area | 22,072 m² (2,37,581 sq ft) |
| Plot area | 3,582 m² (38,556 sq ft) |
| Project cost | ₹37.8 crore |
| Village / locality | Mithiya |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10866 |
What the filings say
What is planned
Shilpgram Samarth is a residential and commercial construction project proposed by Samarth Buildcon. The applicant plans to develop the project on a plot area of 3,582.00 square metres, with a total built-up area of 22,071.74 square metres.
The project consists of three residential blocks (A, B, and C) with a total of 140 units. The residential units are planned as 2 BHK (two-bedroom, hall, and kitchen) apartments. Block A is designed with 14 floors above a hollow plinth, while Blocks B and C are also planned for 14 floors. The project includes two basement levels for parking and services.
Project Highlights
| Item | Detail |
|---|---|
| Total Plot Area | 3,582.00 m² |
| Total Built-up Area | 22,071.74 m² |
| Total FSI Area | 12,579.56 m² |
| Total Residential Units | 140 |
| Total Parking Area | 3,433.37 m² |
| Total Greenbelt Area | 801.41 m² |
| Power Requirement (Operation) | 2.0 MW |
| Water Requirement (Operation) | 142 kl/day |
Layout and design
The layout features three distinct blocks arranged around a central common plot area of 651.41 square metres. Block A is located on one side of the site, while Blocks B and C are positioned together. A 6.00-metre wide approach road and a 6.00-metre wide ramp provide access to the basements.
Parking is distributed across two basement levels and the ground floor (hollow plinth). The total parking provision is 3,433.37 square metres, accommodating approximately 157 Equivalent Car Spaces (ECS). The design includes 1.80-metre wide walkways and peripheral open spaces for fire tender movement.
Land and surroundings
The project is located at Final Plot No. 129 of Town Planning Scheme No. 413 (Enasan-Muthiya-Bilasiya) in Ahmedabad. The site is situated within the limits of the Ahmedabad Municipal Corporation (AMC). The nearest railway station is Sabarmati, approximately 5.5 km away, and Ahmedabad Airport is about 9.5 km from the site. The applicant states the land is currently open and undeveloped.
Water, power and access
During the operational phase, the total water requirement is estimated at 142 kl/day. Fresh water (97 kl/day) will be sourced from the AMC (Narmada water). The project will generate 125 kl/day of wastewater, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 150 kl/day. Treated water (45 kl/day) will be reused for flushing and gardening, while the remaining 80 kl/day will be discharged into the AMC drainage line.
Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL). The operational load is expected to be 2.0 MW. For energy conservation, the applicant proposes using LED lighting for common areas, solar street lights, and a 21.75 kW rooftop solar energy system. A Diesel Generator (DG) set will be provided for emergency backup.
Environmental safeguards
The project includes a greenbelt area of 801.41 square metres, comprising 150 square metres of tree cover and 651.41 square metres of lawn. The applicant plans to plant approximately 90 trees. For rainwater harvesting, two percolation wells are proposed to recharge the ground aquifer.
Solid waste generation is estimated at 420 kg/day. This will be segregated into dry waste (189 kg/day) and wet waste (231 kg/day). Wet waste will be processed in an on-house Organic Waste Converter (OWC) to produce manure for the greenbelt, while dry waste will be collected by the AMC for disposal at a landfill site.
Shilpgram Samarth site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 91% of them.
209 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mithiya, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Angan Sky — environmental approval granted, 100 m away
- The Vintage — environmental approval granted, 150 m away
- The Vintage — environmental approval granted, 150 m away
- The Green Leaf — environmental approval granted, 350 m away
- Naroda Prime & Prestige — under environmental review, 500 m away
- Green Valley — initial checks, 500 m away
- Green Valley — environmental approval granted, 500 m away
- Green Valley — environmental approval granted, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.