What is Developing? Open the mapMap

Environmental approval grantedIndustry · Kachchh, Gujarat

Proposed Standalone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (2 x 2.5 Million TPA) at Mundra Industrial Area, Taluka: Mundra, District: Kachchh, Gujarat by M/s. Ambuja Concrete North Private Limited

Proposed Standalone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (2 x 2.5 Million TPA) at Mundra Industrial Area, Taluka: Mundra, District: Kachchh, Gujarat by M/s. Ambuja Concrete North Private Limited is an approved industrial project in Na, Mandvi, Kachchh, Gujarat. The site covers 24.4 acres. Its stated project cost is ₹1,250 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Apr 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Standalone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (2 x 2.5 Million TPA) at Mundra Industrial Area, Taluka: Mundra, District: Kachchh, Gujarat by M/s. Ambuja Concrete North Private Limited is an approved industrial project in Na, Mandvi, Kachchh, Gujarat. The site covers 24.4 acres.

Who is building it?

The applicant is Ambuja Concrete North Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 Apr 2026), as of 27 Nov 2026.

Where is it?

In Na, Mandvi, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹1,250 crore and a site of 24.4 acres.

When was it filed?

The application was filed on 23 Jan 2026.

Project details

StatusEnvironmental approval granted
Status since28 Apr 2026
Application filed23 Jan 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantAmbuja Concrete North Private Limited
Land area24.4 acres (9.9 ha)
Project cost₹1,250 crore
Village / localityNa
Taluk / tehsilMandvi
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10950

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Jan 2026 (this page)Environmental approval granted24.4 acres₹1,250 crore
Early planning filed 4 Jan 2025Cleared for impact study24.4 acres₹1,250 crore

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.4 acres, this one is smaller than 59% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Na, Mandvi, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (5.1 km away).

Other projects nearby

All 19 Ambuja Concrete North projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.