Quick answers
What is Mining project by M/s. Karshanbhai Namalabhai Vasava?
This proposed mining project by M/s. Karshanbhai Namalabhai Vasava is in Kantvav, Mangrol, Surat, Gujarat. The site covers 4.3 acres.
Who is building it?
The applicant is Vasava Karsanbhai Namlabhai.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kantvav, Mangrol, Surat, Gujarat.
How big is it?
It has a stated cost of ₹1 crore and a site of 4.3 acres.
When was it filed?
The application was filed on 10 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Jun 2026 |
| Application filed | 10 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Vasava Karsanbhai Namlabhai |
| Land area | 4.3 acres (1.7 ha) |
| Project cost | ₹1 crore |
| Village / locality | Kantvav |
| Taluk / tehsil | Mangrol |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10970 |
In context
155 applications in Surat since January 2022 are in the same category (Mining): 48 approved, 24 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.3 acres, this one is smaller than 64% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 36.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Kantvav, Mangrol, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Vasantbhai Chhaganbhai Vasava — environmental approval granted, 100 m away
- Shri Vasantbhai Chhaganbhai Vasava — cleared for impact study, 100 m away
- M/S. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — environmental approval granted, 200 m away
- M/S. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — lapsed, 200 m away
- Shiv Stone Quarry C/o- Kunalbhai Somatbhai Ravaliya — environmental approval granted, 200 m away
- M/s. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — environmental approval granted, 200 m away
- Shiv Stone Quarry C/o- Kunalbhai Somatbhai Ravaliya — environmental approval granted, 200 m away
- Mining project by M/s. Karshanbhai Namlabhai Vasava — under environmental review, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.