Under environmental reviewIndustry · Kheda, Gujarat

Expansion of Cement Production Capacity (3.0 Million TPA to 6.5 Million TPA) of Existing Grinding unit by installation of New Line - II (3.5 Million TPA)

Expansion of Cement Production Capacity (3.0 Million TPA to 6.5 Million TPA) of Existing Grinding unit by installation of New Line - II (3.5 Million TPA) is a proposed industrial project in Sangol, Galteshwar, Kheda, Gujarat. The site covers 69.4 acres. Its stated project cost is ₹1,051.7 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 17 Oct 2026).

See it on the live map All projects in Kheda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Cement Production Capacity (3.0 Million TPA to 6.5 Million TPA) of Existing…

Project details

Official titleExpansion of Cement Production Capacity (3.0 Million TPA to 6.5 Million TPA) of Existing Grinding unit by installation of New Line - II (3.5 Million TPA) at Village: Sangol, Post: Sonipur, District: Kheda (Gujarat) by M/s. UltraTech Cement Ltd. (Unit: Wanakbori Cement Works)
StatusUnder environmental review
Status since17 Oct 2026
Application filed21 Aug 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantUltraTech Cement Limited
Land area69.4 acres (28.1 ha)
Project cost₹1,051.7 crore
Village / localitySangol
Taluk / tehsilGalteshwar
DistrictKheda
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11111

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 21 Aug 2026 (this page)Under environmental review69.4 acres₹1,051.7 crore
Early planning filed 11 Nov 2025Cleared for impact study69.4 acres₹1,051.7 crore

In context

36 applications in Kheda since January 2022 are in the same category (Industry): 26 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 69.4 acres, this one is larger than 94% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sangol, Galteshwar, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.