One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Shiva Pharmachem Limited
Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 19 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shiva Pharmachem Limited |
| Land area | 27.3 acres (11 ha) |
| Project cost | ₹338.5 crore |
| Village / locality | Dahej |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11191 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 19 Feb 2026 (this page) | Under environmental review | 27.3 acres | ₹338.5 crore |
| Early planning filed 7 May 2025 | Cleared for impact study | 27.3 acres | ₹338.5 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.3 acres, this one is larger than 83% of them.
231 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahej, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Shiva Pharmachem Limited — cleared for impact study, 0 m away
- Industrial project by M/s. Pidilite Industries Limited — environmental approval granted, 300 m away
- Industrial project by M/s. Pidilite Industries Limited — cleared for impact study, 300 m away
- Saraswati Township Spur pipeline — lapsed, 650 m away
- Proposed Expansion along with modernization/modifications in Existing… — under environmental review, 750 m away
- Proposed Expansion along with modernization/modifications in Existing… — coastal clearance granted, 750 m away
- Proposed Expansion along with modernization/modifications in Existing… — cleared for impact study, 950 m away
- Expansion in synthetic organic chemicals manufacturing by M/s Deepak Phenolics… — environmental approval granted, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.