Project details
| Status | Initial checks |
|---|---|
| Status since | 18 May 2026 |
| Application filed | 18 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Nandesari Drugs and Pharmaceuticals Private Limited |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹35.6 crore |
| Village / locality | Nandesari |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11354 |
In context
178 applications in Vadodara since January 2022 are in the same category (Industry): 91 approved, 71 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.4 acres, this one is smaller than 76% of them.
93 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandesari, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Sodium Metal Pvt. Ltd. (Unit-2) — environmental approval granted, 200 m away
- Industrial project by M/s. Sodium Metal Pvt. Ltd. (Unit-2) — lapsed, 200 m away
- Industrial project by M/s. Sodium Metal Pvt. Ltd. (Unit-2) — more information requested, 200 m away
- Setting up a synthetic organic chemical manufacturing unit at Plot No 176,… — under environmental review, 250 m away
- EC Transfer to M/s. Styrenix Performance Materials Limited (Nandesari Unit) — environmental approval granted, 300 m away
- Proposed new project for manufacturing of Synthetic Organic Chemical by M/s.… — environmental approval granted, 350 m away
- Proposed new project for manufacturing of Synthetic Organic Chemical by M/s.… — cleared for impact study, 350 m away
- Proposed new project for manufacturing of Synthetic Organic Chemical by M/s.… — lapsed, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.