Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 2 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hari Om Infrastructure |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹110.5 crore |
| Village / locality | Jagatpur |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11516 |
What the filings say
What is planned
Hari Om Infrastructure proposes a new residential and commercial project named "The Greenland" in Jagatpur, Ahmedabad. According to the applicant's project report, the development is planned on a plot area of 7,353.31 square metres (approximately 0.73 hectares or 1.81 acres). The project will consist of eight blocks (A to H) providing residential units and commercial shops.
The building configuration includes a hollow plinth for parking and 14 upper floors. The commercial component features 34 shops located on the ground floor. The residential portion is designed as affordable housing under the Residential Affordable Housing (RAH) project category.
Key Figures
| Item | Detail |
|---|---|
| Total Plot Area | 7,353.31 sq. mt. |
| Common Plot Area | 735.31 sq. mt. |
| Total Approach Road Length | 147.85 mt. |
| Proposed Floors | Hollow Plinth + 14 Floors |
| Commercial Units | 34 Shops |
| Power Requirement (Construction) | 25 kW |
| Power Requirement (Operation) | 1.5 MW |
| Nearest Railway Station | Chandkheda (~1.5 km) |
| Nearest Airport | Ahmedabad (~10.5 km) |
Layout and design
The site layout includes a central common plot and a 7.50-metre wide approach road circulating within the premises. The project is situated adjacent to a 24.00-metre wide Town Planning Scheme (TPS) road and a 12.00-metre wide TPS road.
Design features specified in the conceptual plan include:
- Parking: Hollow plinth parking as per the layout plan.
- Lifts: Each block is equipped with two lifts, including one designated as a fire lift with a capacity for 13 persons.
- Fire Safety: The plan includes a hydrant system, fire house boxes, two-way Siamese connections, and a 1,00,000-litre underground water tank for fire safety, supplemented by a 20,000-litre overhead tank.
- Accessibility: Pedestrian ramps and drinking water facilities for disabled persons are included as per building regulations.
Water, power and access
Water for the project will be sourced from the Ahmedabad Municipal Corporation (AMC). The applicant states that if groundwater extraction becomes necessary, permission will be sought from the Central Ground Water Authority (CGWA). Sewage generated will be treated in an on-site Sewage Treatment Plant (STP). Treated water is intended for flushing and gardening, with the remainder discharged into the AMC drainage line.
Electricity will be supplied by Uttar Gujarat Vij Company Limited (UGVCL). For emergency backup, the project will utilize silent Diesel Generator (DG) sets. Access to the site is provided via existing municipal roads within the Ahmedabad city limits.
Environmental safeguards
The applicant has proposed several environmental management measures:
- Green Belt: A green belt area will be developed within the site to help abate noise and improve air quality.
- Waste Management: Municipal solid waste will be segregated into dry and wet waste. Wet waste is planned to be converted into manure using an Organic Waste Converter for use as a soil conditioner on-site. Construction waste will be used for leveling low-lying areas.
- Rainwater Harvesting: The project includes a rainwater storage tank and a percolation well system to recharge the aquifer and manage excess runoff.
- Energy Efficiency: Solar-assisted water heating systems and rooftop solar energy installations are planned. The external facade will use non-reflective glass, limited to 50% of the total surface area.
- Air Quality: During construction, water sprinkling and temporary windshield barriers (bamboo and GI sheets) will be used to control dust and suspended particulate matter.
The Greenland site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 59% of them.
195 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jagatpur, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Life in Blue — initial checks, 100 m away
- Life in Blue — returned to applicant, 100 m away
- Life in Blue — environmental approval granted, 100 m away
- The Neemland — under environmental review, 450 m away
- Residential Cum Commercial by Sejal Mehta — environmental approval granted, 450 m away
- Status Sky — environmental approval granted, 550 m away
- Shlok Infra — environmental approval granted, 700 m away
- Hotel & Commercial Building — environmental approval granted, 700 m away
More from Hari Om Infrastructure in Ahmadabad
- Shantam Parmeshwar — environmental approval granted
- Shantam Parmeshwar — environmental approval granted
All 3 Hari Om Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.