Project details
| Status | Initial checks |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 24 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Unnati Buildcon |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹46 crore |
| Village / locality | Kathwada |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11525 |
What the filings say
What is planned
Unnati Buildcon proposes a mixed-use residential and commercial project named Shyam Gold in Kathwada, Ahmadabad. The applicant's layout plan describes the development as a Residential Affordable Housing (RAH) project on a plot area of 4,402.28 square metres (1.09 acres).
The project consists of three blocks (A, B, and C) integrated into a single building structure. It is designed with two basement levels for parking, a ground floor featuring 33 shops, and 14 upper floors for residential use. The residential component includes 194 units, while the commercial component comprises 33 shops, for a total of 227 units.
Project Components
| Item | Detail |
|---|---|
| Total Units | 227 (194 Residential + 33 Commercial) |
| Building Height | Ground + 14 Floors |
| Basement Levels | 2 (Parking) |
| Total Built-up Area | 30,076.33 square metres |
| Total Utilized F.S.I. | 17,188.88 square metres |
| Common Plot Area | 449.85 square metres |
| Tree Plantation | 111 trees provided |
Layout and design
The building layout features a hollow plinth at the ground level for parking alongside the commercial shops. Residential units begin from the first floor. Blocks A, B, and C are served by six lifts in total, with each block having two 12-person lifts. Refuge areas are designated on the 5th, 7th, and 11th floors for safety.
The site includes a 6.00-metre wide approach road and internal roads with widths ranging from 9.15 metres to 6.00 metres to facilitate vehicle movement. A dedicated space for a diesel generator (DG) set and a door-to-door waste collection area are also planned within the margins.
Water, power and access
During the construction phase, water will be sourced from local water tanker suppliers. For the operation phase, the applicant intends to meet the water demand through the Ahmedabad Municipal Corporation (AMC) water supply. The project includes a 150 kilolitres per day (KLD) Moving Bed Biofilm Reactor (MBBR) type sewage treatment plant (STP) occupying 120 square metres.
Power will be supplied by the local utility, with a DG set provided for emergency backup. The design incorporates energy conservation measures such as rooftop solar panels with a capacity of 65 KW and LED lighting for common areas. Access to the site is provided via a 36.00-metre wide and a 12.00-metre wide Town Planning Scheme (TPS) road.
Environmental safeguards
The applicant's Environmental Management Plan (EMP) outlines several mitigation measures:
- Air Quality: Use of 10-metre high wind-breakers, water sprinkling for dust suppression, and tarpaulin covers for construction materials.
- Water Management: Installation of a rain water harvesting system with two percolation wells and a storage tank. Low-flow plumbing fixtures will be used to reduce consumption.
- Waste Management: An onsite organic waste converter (OWC) will process wet waste, while dry waste will be collected by AMC.
- Noise Control: Acoustic enclosures for the DG set and periodic maintenance of construction equipment.
- Greenery: A greenbelt consisting of 111 trees and lawn areas covering 462.01 square metres is planned along the periphery.
Fire and Safety
The project includes a comprehensive fire protection system as per the National Building Code. This includes an underground water tank of 1,00,000 litres and an overhead tank of 20,000 litres dedicated to fire safety. Other features include a hydrant system, automatic sprinklers in the basement and shops, fire extinguishers (CO2 and DCP types), fire lifts, and a manual fire alarm system. The structural design is intended to meet seismic zone norms for earthquake resistance.
Shyam Gold site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 79% of them.
262 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathwada, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Harishree Buildcon — environmental approval granted, 100 m away
- Harishree Buildcon — more information requested, 100 m away
- Shashwat Gold — initial checks, 100 m away
- Satvam Skyland — initial checks, 550 m away
- "altezza Pros" — environmental approval granted, 550 m away
- Altezza Pros — environmental approval granted, 550 m away
- Altezza Pros — environmental approval granted, 550 m away
- Altezza Pros — returned to applicant, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.