Quick answers
What is this project?
Virpur Lusari Block-03 for Bauxite (Aluminous Laterite), Laterite, Limestone & Marl Mining Project located at Survey no. 279 is a withdrawn mining project in Virpur, Kalyanpur, Devbhumi Dwarka, Gujarat. The site covers 26.8 acres.
Who is building it?
The applicant is Ignite Minerals.
Has it been approved?
No. The application was withdrawn on 1 Aug 2026, so it is no longer under consideration.
Where is it?
In Virpur, Kalyanpur, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹11.8 crore and a site of 26.8 acres.
When was it filed?
The application was filed on 1 Aug 2026.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 1 Aug 2026 |
| Application filed | 1 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ignite Minerals |
| Land area | 26.8 acres (10.9 ha) |
| Project cost | ₹11.8 crore |
| Village / locality | Virpur |
| Taluk / tehsil | Kalyanpur |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11665 |
In context
171 applications in Devbhumi Dwarka since January 2022 are in the same category (Mining): 103 approved, 44 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 26.8 acres, this one is larger than 95% of them.
No other mining lease on record is within 500 m of this site; 22 have applied within 5 km.
Where it is
Virpur, Kalyanpur, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Virpur Lusari Block-03 (Lease Area- 10.8457 Hect.) with Production Capacity… — returned to applicant, 0 m away
- Proposed Virpur Lusari Block - 08 (Area: 4.04.82 ha) for Bauxite (Aluminous… — lapsed, 1.1 km away
- Shri Kachhara Bhimabhai Kambaria — withdrawn, 1.6 km away
- Virpur Lusari Block-06 (Lease Area- 04.85.57 Hect.) with Production Capacity… — returned to applicant, 1.6 km away
- Mewasa Bauxite Mine — cleared for impact study, 1.6 km away
- Proposed Mevasa Block - 01 (Auctioned Block) (Area: 7.11.08 ha) with Proposed… — lapsed, 1.9 km away
- Virpur Lusari Block 04 for Bauxite (Aluminous Laterite) and Laterite Mining… — under environmental review, 2.3 km away
- Virpur Lusari Block 04 for Bauxite (Aluminous Laterite) and Laterite Mining… — cleared for impact study, 2.3 km away
More from Ignite Minerals in Devbhumi Dwarka
- Virpur Lusari Block-03 (Lease Area- 10.8457 Hect.) with Production Capacity… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.