Proposed Expansion of the Residential Project "Vasudha" by Kaavyaratna Ekarth LLP is a proposed building project in Koba, Gandhinagar, Gujarat. The site covers 2.2 acres.
Who is building it?
The applicant is Kaavyaratna Ekarth LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Koba, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹186.7 crore and a site of 2.2 acres.
When was it filed?
The application was filed on 12 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 12 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Kaavyaratna Ekarth LLP |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹186.7 crore |
| Village / locality | Koba |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11706 |
What the filings say
What is planned
Kaavyaratna Ekarth LLP proposes the expansion of a residential project named "Vasudha" in Koba, Gandhinagar. According to the environmental clearance documents, the project will consist of a single building with two blocks. The structure is planned to have two basements, a ground floor or hollow plinth, and 20 upper floors, reaching a maximum height of 69.75 metres.
The development is designed to house 152 residential units, all of which are configured as 4 BHK (four bedrooms, hall, and kitchen) apartments. The total built-up area is 82,100.03 square metres, with a total Floor Space Index (FSI) area of 50,110.88 square metres.
| Item | Detail |
|---|---|
| Total Built-up Area | 82,100.03 square metres |
| Total FSI Area | 50,110.88 square metres |
| Building Configuration | 2B + G/Hollow Plinth + 20 Floors |
| Total Residential Units | 152 (all 4 BHK) |
| Maximum Building Height | 69.75 metres |
| Total Parking Capacity | 631 Equivalent Car Spaces (CPS) |
| Sewage Treatment Plant Capacity | 150 KLD |
Layout and design
The project layout includes a peripheral margin of 8 metres and internal roads ranging from 8 to 13 metres in width. Separate entry and exit points are planned on the approach road. The applicant has committed to providing electric vehicle charging points for 20% of the parking spaces.
Parking is distributed across the basements and the hollow plinth, covering a total area of 19,661.52 square metres. This includes 12,674.9 square metres in the basement and 6,986.62 square metres in the hollow plinth. The basement height is planned to be greater than 4.5 metres to accommodate potential future mechanical parking systems.
Water, power and access
During the construction phase, the project requires 25 kilolitres per day (KLD) of water, to be sourced from the local authority. For the operation phase, the total water requirement is estimated at 141 KLD. Of this, 90 KLD will be fresh water from the local authority, while the remaining 51 KLD will be met through treated sewage.
Power backup will be provided by a 125 KVA diesel generator (DG) set. The applicant also plans to install 100 KW of solar power generation as an energy conservation measure.
Environmental safeguards
The applicant proposes to install an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD (or 135 KLD as per specific conditions) using Moving Bed Biofilm Reactor (MBBR) technology. Treated wastewater will be reused for flushing and gardening. A dual plumbing system will be installed to facilitate this reuse.
For solid waste management, an onsite Organic Waste Convertor is planned to treat biodegradable waste. Recyclable materials will be sold to vendors. Rainwater harvesting will be managed through three percolation wells. The green belt will cover 1,524.26 square metres, which includes a tree-covered area of 444 square metres with 222 trees.
Under Corporate Environmental Responsibility (CER), the applicant has allocated ₹281 lakh for activities including tree plantation and solar panel installation at a government school, and the construction of two rainwater harvesting pits in a nearby village.
Kaavyaratna Ekarth Expansion of the Residential Project "Vasudha" site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.2 acres, this one is larger than 79% of them.
170 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koba, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vasudha — returned to applicant, 0 m away
- Vasudha — environmental approval granted, 0 m away
- Ekarth Sarvam — environmental approval granted, 50 m away
- Ekarth Sarvam — withdrawn, 50 m away
- Aurelia — environmental approval granted, 150 m away
- Spacelink — environmental approval granted, 300 m away
- Aastha Construction — under environmental review, 300 m away
- The Palace — environmental approval granted, 350 m away
More from Kaavyaratna Ekarth LLP in Gandhinagar
All 3 Kaavyaratna Ekarth projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.