What is Developing? Open the mapMap

Environmental approval grantedIndustry · Valsad, Gujarat

Proposed Expansion in existing plant capacity of Dispersion Agent and Construction Aid Mixture Manufacturing Unit having total capacity of 3210 MT/Month by "M/s. GUJARAT POLYBONDS PVT LTD"

Proposed Expansion in existing plant capacity of Dispersion Agent and Construction Aid Mixture Manufacturing Unit having total capacity of 3210 MT/Month by "M/s. GUJARAT POLYBONDS PVT LTD" is an approved industrial project in Vapi, Valsad, Gujarat. The site covers 1 acre. Its stated project cost is ₹14 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 Aug 2026).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion in existing plant capacity of Dispersion Agent and Construction Aid Mixture Manufacturing Unit having total capacity of 3210 MT/Month by "M/s. GUJARAT POLYBONDS PVT LTD" is an approved industrial project in Vapi, Valsad, Gujarat. The site covers 1 acre.

Who is building it?

The applicant is Gujarat Polybonds Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 7 Aug 2026), as of 27 Nov 2026.

Where is it?

In Vapi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹14 crore and a site of 1 acre.

When was it filed?

The application was filed on 17 Feb 2026.

Project details

StatusEnvironmental approval granted
Status since7 Aug 2026
Application filed17 Feb 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantGujarat Polybonds Private Limited
Land area3,900 m²
Project cost₹14 crore
Village / localityVapi
Taluk / tehsilVapi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11731

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 17 Feb 2026 (this page)Environmental approval granted1 acre₹14 crore
Early planning filed 10 Jul 2024Cleared for impact study1 acre₹14 crore

In context

283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 67% of them.

215 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.