Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Indus Finechem LLP |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹35 crore |
| Village / locality | Jolva |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11804 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 1 Sept 2026 (this page) | Environmental approval granted | 4.3 acres | ₹35 crore |
| New project filed 26 Apr 2023 | Environmental approval granted | 4.3 acres | ₹35 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.3 acres, this one is larger than 52% of them.
328 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jolva, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project for manufacturing of Pesticide Technical and Pesticide… — environmental approval granted, 0 m away
- Industrial project by Majdha Organic PVT. LTD. — environmental approval granted, 200 m away
- Industrial project by Majdha Organic PVT. LTD. — cleared for impact study, 200 m away
- Proposed Synthetic Organic Chemicals (Resin) Manufacturing Unit by M/S. Subham… — cleared for impact study, 200 m away
- Industrial project by M/s. OM SAIRAM INDUSTRIES — environmental approval granted, 350 m away
- Industrial project by M/s. OM SAIRAM INDUSTRIES — cleared for impact study, 350 m away
- Mentor Pharma Chem — initial checks, 350 m away
- Mentor Pharma Chem — initial checks, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.